C) Lay-in Panel T-bar Ceiling Installation (Cont.)
7
8
Once the channel bars are in place, close
the cams to hold the position.
9
When the cams are in the closed position,
a wire tie can be wrapped through the
indicated holes to ensure the cam stays
closed.
10
Remove knockouts on junction box to feed
power supply to fixture. Supply wire must
meet applicable electrical codes and be
rated for a minimum of 90°C.
11
Complete necessary splices. Snap the door
onto the junction box.
12
Squeeze wire torsion springs on the light
engine and insert each leg of the spring
into the slots on the brackets on each side
of the opening in the mounting frame.
Locking Screw
13
Once the trim is rotated into place, insert
and tighten the locking screw provided.
Ensure wire torsion springs are installed as
shown to secure the fixture. Make certain
the wire loops are oriented as shown.
14
912-00206-001 Rev. A
Page 4
© Acuity Brands Lighting, Inc. 2020
All Rights Reserved
.
Lithonia Lighting
1400 Lester Road Conyers Georgia 30012
P
800 315 4935
F
770 860 3129
Technical Support
P
800-705-7378
www.Lithonia.com
Align the opening in the trim with the tabs
on the light engine. Rotate the trim
clockwise until trim slot aligns with the
hole in the trim holder.