Cam
C) Lay-in Panel T-bar Ceiling Installation
B) Important Safety Information -
For Your Protection, Read Carefully
1
5
2
Adjust channel bars to the correct spacing
between T-bar. See Page 5 for procedure
for non-accessible ceiling installation.
3
4
6
Assemble the channel bars to each side of the
mounting frame with the included hardware.
Leave the cams loose to adjust the position of
the frame in the ceiling.
Position mounting frame through opening
in ceiling.
Hook channel bars over T-bar and secure
to T-bar by means of wire ties.
Adjust the mounting frame vertically to
align the bottom edge of the draw-down
to either flush or slightly above (1/8” max)
the ceiling line.
1/8
”
Max
Ceiling Line
Mounting Frame
Draw-down
Cut ceiling opening slightly larger than the
outside diameter on the mounting frame.
8-
3/4” diameter opening.
8-
3/4”
Hole
Channel bar hooks
912-00206-001 Rev. A
Page 3
© Acuity Brands Lighting, Inc. 2020
All Rights Reserved
.
Lithonia Lighting
1400 Lester Road Conyers Georgia 30012
P
800 315 4935
F
770 860 3129
Technical Support
P
800-705-7378
www.Lithonia.com
Warning:
Risk of fire. For Non-IC rated luminaires, do not install insulation within 3 inches of fixture sides or wiring compartment, nor
above fixture in such a manner as to entrap heat.
Electric current can cause painful shock or serious injury unless handled properly. For your safety, always remember the following:
•
Turn off the supply power. Do not energize the luminaire until installation is complete.
•
Ground the luminaire to avoid potential electrical shocks.
•
Do not handle an energized luminaire or energize any luminaire with wet hands, when standing on a wet or damp surface, or
in water.