background image

4

2 .   Determine a suitable location to mount 

unit with access to a standard electrical 
outlet . 

3 .   Mount unit on wall in a dry, cool 

environment using the provided wall 
anchors and mounting screws .

1 .   Remove shipping screw before 

mounting unit on wall .

6 .   Cut a 5” length of hose and attach to 

bottom of unit . Attach the splitter to hose .

4 .   Drill two holes into the ice machine using a 

1 .125” size drill bit at the top and bottom .

5 .   Install bulkhead fittings in drilled holes of  

ice machine .

INSTALLATION FOR ICE MACHINE

After installation, activTek recommends emptying and cleaning the ice 

machine completely to ensure no contaminants are present .

CAUTION:

Wall Anchors

Ice Machine 

Walls

NOTE:  

Be sure there are no wires or 
plumbing on the other side of 
the drill area .

 

activTek recommends taping a 
plastic bag to the inside of the ice 
machine on the drill area to catch 
any metal or plastic particles .

Summary of Contents for AP5 MBOE

Page 1: ...MINI BACTERIAL ODOR ERADICATION READ AND KEEP THIS MANUAL FOR REFERENCE PURPOSES Mini Bacteria Odor Eradicator MBOE ...

Page 2: ...If you have any questions concerning this or any activTek product contact your activTek Distributor 2 DidyouforgettoregisteryourAP5MBOE By registering you ll activate your warranty and your privacy is guaranteed Just fill out your warranty registration card and drop it in the mail or register online at www activTek net Please record the name and phone of your activTek Distributor Name_____________...

Page 3: ...not operate unit near heat sources open flame or combustible vapors or gases CAUTION Disconnect power cord before servicing WARNING The AP5 MBOE system should be protected from extreme temperatures for longer product life Operates best in dry cool environments Designed to run at voltages between 100 240 VAC 50 60 Hz The advanced oxidation gases produced by the AP5 MBOE System are powerful oxidizer...

Page 4: ...les into the ice machine using a 1 125 size drill bit at the top and bottom 5 Install bulkhead fittings in drilled holes of ice machine INSTALLATION FOR ICE MACHINE After installation activTek recommends emptying and cleaning the ice machine completely to ensure no contaminants are present CAUTION Wall Anchors Ice Machine Walls NOTE Be sure there are no wires or plumbing on the other side of the d...

Page 5: ... dry cool environment using the provided wall anchors and mounting screws 3 If located inside the cooler the provided hose is not required INSTALLATION FOR ICE MACHINE CONTINUED INSTALLATION FOR WALK IN AND DELICATESSEN COOLERS The amount of ozone produced by the AP5 MBOE System is below the maximum permissible OSHA standard for ozone concentration in an inhabited enclosed area 0 04 ppm WARNING Du...

Page 6: ...2 thumb screws 4 Remove the ActivePure Cell and replace with a new one 5 Replace thumb screws 6 Replace cover and screws REPLACING THE ACTIVEPURE CELL Always disconnect power from unit before attempting to service WARNING NOTE activTek suggests replacing the ActivePure Cell after 2 years of service to maintain peak performance ...

Page 7: ...onal Prefilter by pressing smooth side of pad firmly to Velcro 4 Replace cover and screws OPTIONAL PREFILTER Do not look directly into the unit or directly at the blue ultraviolet UV light as this may cause eye damage or burns to your eyes or skin CAUTION Do not use in an overheated over 120 F or an explosive atmosphere CAUTION Always use a GFI protected outlet in damp or wet locations CAUTION ...

Page 8: ...OT COVERED BYTHISWARRANTY Ordinary wear and tear shall not be considered a defect in workmanship or material These warranties do not apply to filters nor for loss or damage caused by accident fire abuse misuse improper installation leaking modification misapplication or by any repairs other than those provided by our authorized Service Center This warranty is non transferable MISSING SERIAL NUMBER...

Reviews: