13
S002102 6 Station Swing Set
Assembly Instructions (cont)
Please do not overtighten nuts and bolts. Use hand tools only. Do not use power tools. This can
weaken the connection points.
Please ensure that Top Ladder Rung (19) is tted behind both Ladder Handles (28)
and on the
rear of the Leg (18).
Please see the below image for correct assembly.
Please note that the Top Ladder Rung (19) is behind the
Ladder Handles (28)
supporting the slide.
Please note that the Top Ladder Rung (19) is in front of
the Ladder Handles (28)
and not supporting the slide.
Please assemble Chute Side Stay Bar (20) last. Leave the bolts loose until the slide is assembled to the
ladder frame, to make construction easier. Then tighten
Correct Assembly
Incorrect Assembly
28
28
30
C1
D9
C2