actiLib Library 4U – Quick Start Guide
Page 21 of 21
7 Power ON/OFF the library
Part of the operator control panel is the Power On/Off button. Pressing this button will initiate a
controlled Power Down of the unit (soft landing). The following operations will take place before the
unit shuts down completely:
The display indicates with an appropriate message that the shutdown is in progress
The library controller finishes all ongoing loader and drive activities
The robotics is moved to its home position
The library controller switches off the power supply’s secondary side
To abort the shutdown process the user has to press Cancel within the first 3 seconds
Note:
The shutdown process may be aborted by pressing Cancel within the first 3 seconds.