background image

AcraDyne 

    

High-Torque Nutrunners

Operations Manual

PO Box 16460, Portland OR 97292-0460  • 800-852-1368 • Fax 800-582-9015

www.aimco-global.com

Summary of Contents for HT series

Page 1: ...AcraDyne High Torque Nutrunners Operations Manual PO Box 16460 Portland OR 97292 0460 800 852 1368 Fax 800 582 9015 www aimco global com...

Page 2: ...Table of Contents Introduction 3 Safety Information 3 Specifications 4 Operation 5 6 Reaction Bars Safety 7 8 Accessories 9 Recommended Maintenance 10 AIMCO Limited Warranty 11 2...

Page 3: ...lt in serious personal injury b Use safety equipment Always wear eye protection Safety equipment such as dust mask non skid safety shoes hard hat or hearing protection used for appropriate conditions...

Page 4: ...responsible for the setup of these options Tool Speeds should be set taking into consideration the maximum RPM output of the given tool in use Tools with Maximum Rated RPM below 30 should not be ran...

Page 5: ...B again will switch the tool back to FWD mode and will indicate this with no LED lights turned on CAUTION IS REQUIRED FAILURE TO EXERCISE CAUTION AND CORRECT OPERATING TECHNIQUE CAN RESULT IN SERIOUS...

Page 6: ...the Notch in the Reaction Bar Install the Retaining Ring into the Groove of the Gear Box Reconnect the AcraDyne HT Series Nutrunner to an AcraDyne Controller and prepare for use WARNING FOR MODELS TH...

Page 7: ...OR DEATH The guidelines offered below are only guidelines Should there be any doubt as to the integrity of a proposed reaction strategy it is strongly advised to consult with an AcraDyne authorized re...

Page 8: ...to press against an object to counteract Torque Reaction as the tool is delivering Torque THE OPERATOR MUST TAKE GREAT CARE TO KEEP BODY PARTS OR FOREIGN MATTER CLEAR OF THE AREA BETWEEN THE REACTION...

Page 9: ...ail Hoist 8000 Series 25497 Rear fixed hoist ring 8000 Series 25289 Fixed hoist handle not included 8000 Series 25280 Auxiliary Handle 8000 Series SWIVEL HANDLE SWIVEL BAIL HOIST RING FIXED HANDLE WIT...

Page 10: ...rvice Center The tool gear train should be cleaned inspected and re greased every 25 000 tightening cycles Parts should be inspected for wear and any worn parts should be replaced In addition to this...

Page 11: ...s option any products which are returned freight prepaid to AIMCO and which AIMCO determines to be defective as described above or at AIMCO s option refunding the purchase price of such products AIMCO...

Page 12: ...UARTERS 10000 S E Pine St Ave Crist bal Colon 14529 Portland OR 97216 Chihuahua Chihuahua 31125 Mexico 800 852 1368 52 614 380 1010 FAX 800 582 9015 FAX 52 614 380 1019 LIT MAN165 Rev 02 14 Printed in...

Reviews: