Installation Instructions

Location of the unit

The appliance must stand on a non-
combustible constructional hearth
which is at least 125mm thick with the
minimum dimensions as shown in the
opposite diagram (please see Building
regs. Document J for further
information).

If the appliance is to be fitted in a raised
application, due consideration  should
be given to extending the depth of the
superimposed hearth to safely contain
any falling embers or logs.

The hearth and building construction
must be of a suitable material to comply
with current building and local authority
regulations. The fabrication of the
construction must have a suitable load
bearing capacity for the appliance and
hearth.

If in any doubt, please consult a
competent person for advice before
proceeding.

150mm

150mm

225mm

Constructional
Hearth

Superimposed
Hearth

500mm

772mm

125mm

Important information

Before installation and/or use of this
appliance please read these instructions
carefully to ensure that all requirements
are fully understood.

This appliance must be installed by a
registered engineer, or approved by
building control, failure to do so may
endanger life and property.

All the below instructions should work in
conjunction with building regulations
document J, if there is a variation the
most stringent requirement should be
adhered to. 

Asbestos

This appliance contains no asbestos, if
there is the possibility of disturbing any
asbestos in the installation of this
appliance then specialist advice must
be sought and appropriate precautions
taken.

Metal Parts  

This appliance may contain sharp metal
edges, take care when installing or
servicing this appliance to avoid
personal injury. Please use appropriate
personal protective equipment at all
times.

Each installation is unique to the
property, the information contained in
this manual may not give exact
installation requirements for your
installation.

The installation must comply with
Building Regulations, European
Standards and Local authority bylaws.

Fire Cement  

Some types of fire cement are caustic
and should not be allowed to come into
contact with the skin. In case of contact
wash immediately with plenty of water.

6

Tenbury T400 install manual NEW 2020-0320-7  16/03/2020  14:05  Page 6

Summary of Contents for Tenbury T400ECO

Page 1: ...rence Thank you for purchasing an ACR Heat Products stove T E C H N I C A L M A N U A L Document T400ECO 0101 Version 1 Date 02 03 20 Serial Number MULTI FUEL DEFRA EXEMPT AIRWASH SYSTEM 10 YEAR 10 YE...

Page 2: ...contact with the appliance This appliance has been designed for intermittent operation This appliance must not be used as an incinerator Each installation is unique to the property the information co...

Page 3: ...initial 3 minutes Height 550 mm Internal Box 588 mm External Trim Width 396 mm Internal Box 470 mm External Trim Depth 337 mm Recessed 347 mm External Trim Weight 60 kg Air Requirement N A Flue Mass G...

Page 4: ...Technical Data Declaration of Performance 4 Tenbury T400 install manual NEW 2020 0320 7 16 03 2020 14 05 Page 4...

Page 5: ...16 of the Environmental Better regulation Act Northern Ireland 2016 In Wales appliances are exempted by regulations made by Welsh Ministers The Tenbury T400Eco has been recommended as suitable for us...

Page 6: ...od This appliance must be installed by a registered engineer or approved by building control failure to do so may endanger life and property All the below instructions should work in conjunction with...

Page 7: ...onstructed of a non combustible material i e metal studwork Do not use combustible materials within the chequered area 200mm to the sides of the appliance and 300mm to the rear of the appliance Do not...

Page 8: ...ce Flue Requirements The flue must comply with current Building Regulations Document J The construction of masonry flue block insulated flue systems and flexible flue liners must comply with the manuf...

Page 9: ...place and replace the 6 x 10mm screws replace the baffle and install the trim if not already in place 3 4 5 6 7 8 Operating your stove Using your appliance for the first time To allow the appliance t...

Page 10: ...combustion of the wood logs Open the secondary air slider to the left hand side of the door and open the primary air slider to the right hand side of the door by fully pushing the levers inwards Lay f...

Page 11: ...Fuel overloading Never overload the stove it will work very well with two medium sized logs The amount of fuel specified in this manual should not be exceeded overloading can cause excess smoke Glass...

Page 12: ...ite panels of the appliance should be checked regularly for soundness If any wear and tear is found we recommend these parts are replaced immediately Check the rope door seals are intact and are not w...

Page 13: ...l starts to crumble and fall apart in chunks To prevent the issue from happening and prolong the life of your internal panels the homeowner should burn in the refractory panels in the new appliance by...

Page 14: ...ke test Record flue draught reading Spillage test preformed in accordance with available guidance Check socket joints and seals on the flue and appliance Instruct user on correct fuels and fuel storag...

Page 15: ...top removing tool 11 TB 02 11 05A Primary air slider 12 TB 02 11 04A Secondary Tertiary air slider 13 TB 02 30 01A Left hand vermiculite panel 14 TB 02 30 03A Right hand vermiculite panel 15 TB 02 30...

Page 16: ...easoned wood 20 moisture content Low flue draught Consult your installer for advice on suitable flue system Incorrect use of air control See user instructions for correct use of air control Appliance...

Page 17: ...t your installer for advice on suitable flue system Incorrect additional ventilation air into building Consult your installer Continuous smoke spillage into room when appliance in use Blocked flue Ope...

Page 18: ...Address Postcode Daytime Tel Mobile Tel Model Name Model Number Serial Number Date of purchase Date of installation Installer s Name and address Installer s Registration Number Building Control Certif...

Page 19: ...ordance with our instruction manual All Stoves are covered by a 10 year warranty which covers all stove body castings stove body steel panels It does not include consumable items such as glass door se...

Page 20: ...ted Unit 1 Weston Works Weston Lane Tyseley Birmingham B11 3RP England Tel 0121 706 8266 E mail enquiries acrheatproducts co uk www acrheatproducts co uk Tenbury T400 install manual NEW 2020 0320 7 16...

Reviews: