Installation Procedure (Posts and ThrieBeam)
Step 1
Review the site location and identify possible hazards
prior to commencing the installation of the
Sentry
Barrier TL-4 ThrieBeam System
. Any concerns,
please refer to the local Roading Authority.
Step 2
Place a string line from the centre of the downstream asymmetric rail to required location of the
upstream asymmetric rail. The string line should pass over the centre of each post location and be
marked accordingly as the required location for drilling or driving each post.