
- 34 -
OMNISTIM
®
500 PRO USER MANUAL
COPYRIGHT © 2004 - 2018, ACCELERATED CARE PLUS CORP., ALL RIGHTS RESERVED
LEAD WIRE TESTER OPERATION
Lead Wires should be inspected periodically, as well as any time there are output anomalies reported by the patient.
•
Plug the distal (patient end) of the lead wire into the test connectors while observing polarity (red / black).
•
Plug the device end of the lead wire into the receptacle labeled LEAD WIRE TESTER.
•
When the POWER is on, green LED will turn on if the lead wire passes the test. LED will be red if the
lead wires are faulty and need to be replaced.
•
When lead wires pass the test, check for loose connections by holding the lead wire about 3 inches from
plug-in connectors and slowly rotate the lead wire in a circular motion while the wires are plugged in. If
the indicator LED is flickering between red to green, the lead wire should be replaced.
Figure 7
UNIT OUTPUT TEST
When testing a unit for output, the output tester should be used on a constant output protocol.
•
Power unit ON.
•
Insert output tester into channel A.
•
Select Pain / IFC Sensory.
•
Increase the output level to 20mA on channel A.
•
Observe the output tester LED.
–
If the output tester has a solid, brightly lit LED, then
there is sufficient output present on the selected
channel.
•
Change the output tester to channel B and follow the above
process.
Service Center
For repair or service of ACP Products and accessories, please call (800) 350-1100 and follow the prompts. Normal
hours of operation are 6:00am to 5:00pm Pacific Standard Time. After hours, please leave a message and a
technician will return your call during the next scheduled workday.
Patient-end of lead
wire, Red-coded
Patient-end of lead
wire, Black-coded
Device-end of
lead wire
LED lights green when lead
wire is functional, and lights
red when lead wire needs
to be replaced.