VALVE INSTALLATION & ADJUSTMENT
NOTE: Installation should be in accordance with
accepted plumbing practices.
1) Locate suitable place for mounting the valve
assembly. Valve assembly should be
accessible for service and adjustment and
as close to the point-of-use as possible.
Wall anchors and anchoring hardware are
by others.
2) Connect hot and cold water to supply
valve using 1/2” NPTE connections by others.
3) Connect outlet of tempering valve to
spout using 1/2” NPT connections
provided (Refer to pg.8).
4) Turn on hot and cold water supplies. If any
leaks are observed, hand-tighten
connections as necessary to stop leaks
before proceeding.
5) Turn on fixture and allow water to flow for 2
minutes. Measure water temperature at
outlet. If water is not at desired temperature,
adjust as necessary.
1) Loosen locknut.
2) Turn on fixture and run water for at least 2
minutes. Allow supply temperature to
stabilize.
3) Turn temperature stem counter-clockwise
for hotter or clockwise for colder outlet
temperature.
4) Tighten locknut to prevent accidental or
unauthorized temperature adjustment.
5) Re-check outlet temperature.
Temperature Adjustment
Valve Assembly Installation:
!
IMPORTANT
Flush supply lines of all foreign material such
as pipe dope, pipe chips, solder, sand etc.
before making up supply connections.
HINT: Angle stops are recommended
and is the responsibility of the installer.
LOCKNUT
WARMER
TEMPERATURE
STEM
1
2
1
(For -MXTP Option):
Revised A: 10/24/22
Page 10 of 18
Part #: 6216-011-000
INSTALLATION, OPERATION
& MAINTENANCE MANUAL
NEO-METRO FIELD SERVICE
TOLL FREE
800-743-8259 •
LOCAL
626-855-4866 •
FAX
626-855-4863