INSTALLATION, OPERATIONS & MAINTENANCE MANUAL
Please visit
www.acorneng.com
for most current specifications.
ACORN ENGINEERING FIELD SERVICE
TOLL FREE
800-743-8259 •
LOCAL
626-855-4866 •
FAX
626-855-4863
MERIDIAN 3802
4
Install grid strainer and close elbow to
basin bowl using plumber's putty.
1.
3.
4.
5.
Grid Strainer w/ 1-1/2" -16 UNE Threads
2. Rubber Gasket
Flat Fiber Washer
1-1/2" -16 UNI Rough Chrome Brass
Jam Nut
1-1/2"-16 x 1-1/4" UNI Close Ell
with 3/8" NPT Clean-Out Plug
WASTE PLUMBING
Assemble waste piping using teflon tape on all
5
threaded connections and make up waste
connections to 1-1/2” P-Trap.
HINT: Teflon tape is recommended on all
threaded waste and supply connections.
NOTE: ADD TEFLON TAPE TO ITEM (1) BEFORE
ASSEMBLING ITEM (5)
CUT TO FIT TAILPIECE
AS NEEDED
1
2
3
4
5
7
1
2
"
Date: 01/10/17
Page 7 of 22
Part #: 6216-011-000