Chapter 1
5
Power supply
•
Maximum power rating should satisfy the minimal requirement of system spec.
•
Protection circuits are required on over voltage, short circuit, over current,and over power protection.
•
Safety and EMI certification is required as system certification.
•
Quotation required on non-PFC 110/220V manual switch, PFC 220V, full range, and Energy Start 5.0
compliance.
Summary of Contents for Veriton X4620G
Page 1: ...Acer Veriton X6620G Service Guide PRINTED IN TAIWAN ...
Page 14: ...6 Chapter 1 Block Diagram ...
Page 76: ...Chapter 3 68 Reinstalling the I O Shielding 1 Install I O shielding into chassis ...
Page 89: ...81 Chapter 3 3 Secures the guard card hook to the chassis using two screws ...
Page 112: ...Chapter 5 104 M B Placement Jumper and Connector Information Chapter 5 ...