Power supply
•
Maximum power rating should satisfy the minimal requirement of system spec.
•
Protection circuits are required on over voltage, short circuit, over current,and over power protection.
•
Safety and EMI certification is required as system certification.
•
Quotation required on non-PFC 110/220V manual switch, PFC 220V, full range, and Energy Start 5.0
compliance.