19
3. Firmware Upgrade Process
1. Materials list and connection
USB
port driver
ISP TOOL
2.Install USB driver.
When insert the USB cable to PC USB port, will pop up a Hardware Wizard to help you install the USB driver if you use
this ISP board first time.it can auto install success by itself
Remark: The USB driver files path: D:\FTC100103(Mstar)\FTCUSB.INF
After installation the USB serial port driver, please check the port. Look the properties of “my Computer”
FW
USB
HDMI
DVI to HDMI
ISP JIG:
715GT089-C
Power cable
Power cable
ACER_QG241Y_A2H_
VSL_RTD2522AR_TP
M238WF1_HVN01_U_
20200722_V0.02_150A
_Reduce_ERP
Summary of Contents for QG241Y
Page 8: ...8 S4 Remove the screws to remove the key board ...
Page 10: ...10 S5 Separate the panel the middle frame and the LED board ...
Page 12: ...12 S7 Remove the main board and power board Disconnect the cables ...
Page 14: ...14 S3 Assemble the middle frame the LED board and the panel ...
Page 18: ...18 S7 Assemble the stand and base ASS Y ...
Page 25: ...25 4 3 How to close the burn in mode Set the burn in to OFF ...
Page 28: ...28 4 2 Select the EDID folder 4 3 Load EDID successful ...
Page 29: ...29 4 4 Tick the Only connect HDMI and Write SN 4 5 Set the OtherSetting as below ...