- 32 -
5.2 Software / Firmware Upgrade Process
5.2.1 Hardware prepared:
Hardware Requirement:
1. ISP board x 1
2. DSUB VGA cables x 2
3. Printer cable (with one male connector and another female connector) x 1.
4. PC or Notebook with parallel (printer) port x1.
Connect to target monitor
VGA signal input from 15pin D-sub
cable of PC or NB.
Connect ISP board and
PC with printer port cable
Check the Jumpers on the
ISP Circuit Board (make
sure J5, J6, J7, J8 are set
at ping 1,2 )
Summary of Contents for P244W
Page 19: ... 19 3 9 Packing ...
Page 20: ... 20 4 Disassembly Assembly 4 1 Exploded View ...
Page 35: ... 35 ...
Page 40: ... 40 5 4 OSD Operation Guide ...
Page 41: ... 41 ...
Page 42: ... 42 ...
Page 43: ... 43 ...
Page 44: ... 44 ...
Page 45: ... 45 1 3 OSD Message ...
Page 46: ... 46 1 4 OSD Operation Flow 1 4 1 Main Flow ...
Page 47: ... 47 1 4 2 Active the Acer eColor Management ...
Page 48: ... 48 1 4 3 Reset Flow ...
Page 63: ... 63 Fig 2 Appearance Description ...
Page 64: ... 64 Appendix 3 Control Board ...
Page 65: ... 65 Appendix 4 Power Board ...
Page 66: ... 66 ...
Page 67: ... 67 Appendix 5 LED Board ...