
139
System rack installation
Aside from its tower configuration, the Altos G301 server system can
also be mounted in a rack-model position. A rack mount kit is available
for customers who want to convert a tower-mounted system to rack-
model design. To purchase a rack mount kit, contact your local Acer
representative.
aa300.book Page 139 Tuesday, December 17, 2002 5:27 PM
Summary of Contents for G301
Page 1: ...Acer Altos G300 Series User s guide ...
Page 8: ...viii ...
Page 13: ...1 Getting started ...
Page 21: ...9 Connecting the mouse ...
Page 22: ...1 Getting started 10 Connecting the VGA monitor Connecting to the network ...
Page 23: ...11 Connecting the power cable ...
Page 29: ...2 System tour ...
Page 30: ...This chapter discusses the features and components of your computer ...
Page 40: ...2 System tour 28 ...
Page 41: ...3 Upgrading your system ...
Page 42: ...This chapter contains instructions on how to upgrade your computer ...
Page 47: ...35 5 Detach the side panel 6 Repeat steps 4 to 5 to remove the other side panel ...
Page 59: ...4 Setup utility ...
Page 90: ...4 Setup utility 78 ...
Page 91: ...5 Configuring IDE Software RAID ...
Page 129: ...117 ...
Page 130: ...5 Configuring IDE Software RAID 118 ...
Page 131: ...Appendix A AMIBIOS POST Checkpoint Codes ...
Page 132: ......
Page 145: ...Appendix B ASM quick installation guide ...
Page 146: ...This appendix shows you how to install the ASM software package ...