Appendix A: Server management tools
136
10 Press
Enter
, then
Yes
to save the configuration.
11 Press any key to revert to the Configuration menu.
To initialize a RAID volume:
1
Access the Management menu.
2
On the Management menu, select
Initialize
.
Under Logical Drives, the created logical drives is listed.
3
Use the space bar to select drives to initialize.
Under Logical Drives, the selected drive is highlighted in yellow.
4
After selecting the drives, press
F10
, then select
Yes
to initialize
the logical drives.
5
After the initialization is completed, press
Esc
.
6
Press
Esc
again to revert to the Management menu.
7
Select
Exit
, then
Yes
.
8
Press
Ctrl
+
Alt
+
Del
to reboot the system.
To assign a hot spare disk:
1
Access the Management menu.
2
On the Management menu, select
Objects
.
3
On the Objects menu, select
Physical Drive
.
4
Under the Physical Drive, select a free disk that is marked as
READY
, then press
Enter
.
5
Select
Make Hot Spare
, then press
Enter
.
6
Select
Yes
.
Under Physical Drive, the assigned hot spare disk is marked as
HOTSP
.
7
Press
Esc
to revert to the Management menu.
8
Select
Yes
.
9
Press
Ctrl
+
Alt
+
Del
to reboot the system.
Proceed to the installation of the operating system. Refer to the
user documentation that came with your OS for related
instructions.
Summary of Contents for Altos R520 M2
Page 1: ...Acer Altos R520 M2 Series User s Guide ...
Page 14: ...xiv ...
Page 19: ...1 System tour ...
Page 35: ...17 54 U23 Broadcom BCM5221PHY chipset 55 U6 Intel 82576EB GbE chipset No Code Description ...
Page 43: ...2 System setup ...
Page 51: ...3 System upgrade ...
Page 95: ...4 System BIOS ...
Page 102: ...4 System BIOS 84 Processor Configuration ...
Page 108: ...4 System BIOS 90 Memory Configuration ...
Page 110: ...4 System BIOS 92 Advanced Chipset Configuration ...
Page 136: ...4 System BIOS 118 ...
Page 137: ...5 System troubleshooting ...
Page 149: ...Appendix A Server management tools ...
Page 158: ...Appendix A Server management tools 140 ...
Page 159: ...Appendix B Rack mount configuration ...
Page 160: ...This appendix shows you how to set up the Altos R520 M2 server in a rack mount configuration ...
Page 168: ...Appendix B Rack mount configuration 150 6 Fully extend the mounting rails on the rack ...
Page 172: ...Appendix B Rack mount configuration 154 ...
Page 173: ...Appendix C Altos eXpress Console ...
Page 174: ...This appendix provides information about the Altos eXpress Console utility ...
Page 214: ...Appendix C Altos eXpress Console 196 ...
Page 218: ...200 ...