Setting up the system
Pre-installation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for the system for
maximum efficiency. Consider the following factors when choosing a site for the system:
Near a grounded power outlet.
Clean and dust-free
Stable surface free from vibration.
Well-ventilated and away from sources of heat.
Secluded from electromagnetic fields produced by electrical devices such as air
conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
System unit
Accessory box
If any of the above items is damaged or missing, contact your dealer immediately.
Save the boxes and packing materials for future use.
Summary of Contents for Altos BrainSphere P130 F7
Page 1: ...Altos BrainSphere P130 F7 User Guide...
Page 5: ...Motherboard Layout...
Page 6: ......
Page 7: ...I O Panel...
Page 8: ...Installing the CPU...
Page 9: ......
Page 10: ...Installing Memory Modules DIMM...
Page 11: ...Installing Memory Modules DIMM...
Page 12: ...Expansion Slots PCI Express Slots...
Page 13: ...Jumpers Setup...
Page 14: ...Onboard Headers and Connectors...
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ...M 2_SSD Module Installation Guide...
Page 21: ......
Page 22: ...M 2 WiFi BT Module and Intel CNVi Integrated WiFi BT Installation Guide...