![ACEK9 Hot-N-Pop Pro Installation Manual Download Page 5](http://html1.mh-extra.com/html/acek9/hot-n-pop-pro/hot-n-pop-pro_installation-manual_457634005.webp)
4
STEP 2 Control Head installation
Mount securely in a location that is dry and visible to the K9 handler. Plug the control head
cable into the head.
STEP 3 Intelabox installation
Mount the IntelaBox in a location that allows easy access
Find a DRY location where it is easily serviceable for upgrades and programming.
Route the Control Head Cable
to the Intelabox. Attach the cable, be sure that the cables
(RJ45) connectors go in straight and the cable is not kinked. Do not run control head cable
parallel to transmitting antenna cables.
STEP 4 Protective Relay Module (PRM) Installation
The Protective Relay Module is the output controller for heat alarm options and accessories.
•
Locate the Protective relay module near the Intelabox.
•
Connect the IntelaBox Heat Alarm Option Cable (Gray Cable with black
connector) to Protective Relay Module (PRM).
•
Connect the Intelabox 10 Gauge Red Male Wire to the Red Female wire off the PRM.
•
Attach the
PRM Black Ground
(PIN 12) wire to a chassis ground.
•
Attach PRM's
Red Battery wire to
uninterrupted
Battery
or connection point capable of
supplying 40A of power.
Fuse at connection point (40A).
Battery connection must be direct. Do not use a device that automatically
removes power to vehicle and connected system that notify the K9 handler when
the system activates
.
This system has features designed to operate with the IGNITION OFF.
•
When power is connected, the head will power up briefly and turn itself off. Continue with
install.