F
Dear Customer
Congratulations on the purchase of your greenhouse. Thanks to this manual, no technical foreknowledge is required for assembling the greenhouse. Reading through the
manual step by step will allow you to prepare all necessary parts and acts for the assembly of your greenhouse.
Safety and Efficiency
Glass is heavy, sharp-edged and fragile. A ladder is high and unstable. Aluminium profiles are sometimes long and sharp-edged. So, be careful when you are not familiar
with handling these materials. Therefore, it is better to keep children away during the assembly. Safety shoes, safety glasses and safety gloves may therefore be very useful
and are essential when assembling glass.
Tools:
- 2x 10mm screw-wrenches
- Knife or solid scissors
- Star screwdriver (large type)
- Flat screw-driver (large type)
- Spirit level
- Shovel
- Rope or measuring rod min. 7 meters
- Ladder (self-standing)
Tools available in all D.I.Y.-shops:
- Quick-drying concrete to solidly anchor your greenhouse
- Neutral silicone.
Actions prior to assembly
Open all the boxes and sort all parts according tot he usage which is mentioned on the contents of boxes.
Petty Facts
- Bolt slots are slots in which fits a bolt head. Nearly all profiles in this greenhouse have 1 or more bolt slots.
- In the event of bolt slot connections, always make sure that the profiles are closely pressed to one another.
- Stop bolts are bolts that we slide in a slot in preparation of further assembly; these bolts are temporarily retained by nuts at some 10cm of the profile end.
- A greenhouse consists of 2 façades (front and back), 2 sidewalls and a roof.
- Except when explicitly mentioned otherwise, short bolts (M6X10) are used.
Advice
Always use all detailed views as aid to align, line up and position your profile. Pay attention to section and perforations.
When fixing the nuts on the bolts, only make 2 turns; only definitively tighten the bolts and nuts after having gone through the entire page.
Summary of Contents for Aurelie
Page 11: ...Serre Aur lie J...
Page 19: ...Serre Babette R...
Page 31: ...2x 2x 1 2 3 W 4 7 5 6 9 8 a c b c c b a c a c c a a c a c c a c a a 2...
Page 33: ...1 2 3 4 5 6 W a c b a c c c b a a c c a c a c Aureli 4x Babette 6x Aureli 4x Babette 6x 4...
Page 34: ...m m 26 m m 26 2x 2x T0004 L 1643mm 4X T0004 L 1639mm 4X a c a c a c a c a c c a a c c a 5...
Page 35: ...1a 2 1b 1b 1a 2 1b 1a 2 6...
Page 37: ...2a 2b 4 6 5 b a c a c c 1 3a 3b c a c a c a c a w a a c c Aureli Aureli 8...
Page 38: ...2362 2307 A A B B A B 1 1 2 2 3 3 2 2 3 3 1 2 A 3 3 B A B 9...
Page 39: ...1 1 3 3 4 4 2 2 2 2 10...
Page 43: ...2 4 1 3a 3b 5a 3b 5b 3a 5a 5b 3b 3a Aurelie L 1760mm Babette L 2498mm 3X A 13...
Page 44: ...1 2 1 2 1 2 a a c c a a c c 14...
Page 46: ...1 2 3 4 6 5 7 8 a c a c b c a c a c b c 16...
Page 47: ...5cm DIN933 M6x10 DIN933 M6x16 DIN934 M6 4x L 345mm 4X KC 4X a b c b b 1 2 17...
Page 48: ...c c c 18...
Page 49: ...KA KB KB KB KA KA 1 2 4 3 2 4 5 2 4 6 6 6 6 6 1 3 5 a b c d 6 5 6 2 4 a b AA 19...
Page 51: ...2 a b c d 4 2 ED 3 a b BC 1 21...
Page 53: ...4 5 4 5 b c a AA d a b c 2 2 1 a b c 2 b a c 23...
Page 54: ...4 1 2 3 A B A B A B A B 2 1 B 3 A A B 4 24...
Page 55: ...1 2 3 4 3 1 2 4 25...
Page 59: ...27...
Page 61: ...CN 1 a 2 CN 3 a A CA 4 c d a b 4 CA 5 4 5 5 4 2 1 3 4 CN A C N Qty Fig Nr L mm 870x730 30 29...
Page 63: ...31...