![Accu-Flo Meter Service Red Jacket AGUMP150S1 Installation, Operation, Service & Repair Parts Download Page 33](http://html.mh-extra.com/html/accu-flo-meter-service/red-jacket-agump150s1/red-jacket-agump150s1_installation-operation-service-and-repair-parts_456015033.webp)
— 27 —
20: Insert the lock-down bolts and torque to 45-55 ft lb (61-75 N•m).
21: Loosen the bolts that hold the conduit box to the manifold. Do not remove.
22: Swing the electrical connector into position.
23: Torque the electrical connector bolt to 25-50 ft lb (34-68 N•m).
24: Torque the conduit box bolts to 30-45 ft lb (40-61 N•m).
Suggested tools (non-sparking): 3/4” wrench, pipe wrench,
1/4” allen wrench, 9/16” wrench, screw driver, wire cutter and
wire stripper.
Summary of Contents for Red Jacket AGUMP150S1
Page 14: ... 8 4 Petroleum AG ...
Page 38: ...4 Petroleum AG FSA 1 2 3 4 4 4 PUMP PARTS 32 ...