— 26 —
4” Petroleum & AG
8:
Attach tubing to barbed fitting, secure with clamp.
9:
Lay tubing beside column pipe. Cut off 1-3 inches (25-76 mm) above the
discharge head.
10: Secure tube to column pipe with tie straps. Locate tie straps approximately 6 inches
(152 mm) from packer, 6 inches (152 mm) from discharge head and middle of tubing.
For fixed length pump, skip to conduit box wiring
11: Remove cover from wiring compartment.
12: Pull pigtail wires into wiring compartment.
13: Cut pigtail wires extending approximately 8-inches (200 mm) out of
wiring compartment.
14: Strip back insulation of all wires 3/8-inch (10 mm).
15: Using supplied wire nuts, attach like colored pump pigtail wires to wires.
See figure 4.8 to verify connections.
16: Install excess wire into wiring compartment. Replace wiring compartment cover.
Torque to 35 ft lb (50 N•m). Thread sealant should not be used.
17: Install the pump into the manifold.
Before replacing the extractable, make sure that the surfaces
of the packer o-ring and the discharge o-ring seals are clean.
18: Align the positioning dowels of the manifold with the holes in the packer.
19: Push the packer as far as possible against the manifold.
Figure 4.8 Wiring Schematic
ORANGE
BLACK
CAPACITOR
ORANGE
BLACK
RED
IN FROM
ELECTRICAL
CONNECTOR
OUT TO
PUMP PIGTAIL
NOTICE
Summary of Contents for Red Jacket AGUMP150S1
Page 14: ... 8 4 Petroleum AG ...
Page 38: ...4 Petroleum AG FSA 1 2 3 4 4 4 PUMP PARTS 32 ...