![Abus TVAC10100 User Manual Download Page 28](http://html.mh-extra.com/html/abus/tvac10100/tvac10100_user-manual_454574028.webp)
28
English
Push the menu button again to open the submenu for the RS485 settings.
Use the
▲▼
buttons to navigate through the menu.
Keep pushing the menu button to open the respective subitem.
Use the
◄►
buttons to change the settings for the respective subitem.
Use the menu button to confirm your change.
For correct operation of the speed dome, the settings of the monitor's RS485 interface must match the speed
dome settings.
e.g.
Camera ID
1
(identification number of the camera)
Pelco
D
(Setting the control protocol to Pelco D or P)
Baud rate
4800 (baud rate setting for the control signals)
Controlling the camera:
You can steer the camera with the arrow buttons.
Zooming the camera:
Zoom in:
Push the
▲
and
►
buttons simultaneously
Zoom out:
Push the
▼
and
◄
buttons simultaneously.
7.5. Continuity test
The test monitor enables you to test 2 cables for short circuits. Connect the cables on one side to perform a
continuity test.
Use the MODE button so select the continuity test mode („cable test“).
Connect the first cable to the right connector and/or the second cable to the left connector of the terminal
strip.
The measurement result is displayed as follows:
Cable test
Cable1 NG
Cable2 NG
OK
There is no interruption
NG
The cable shows an interruption.
Cable 1
Cable 2