PAGE 8
ABSCO INDUSTRIES
ASSEMBLY INSTRUCTION - MODEL: J30232G 14/08/14
CUSTOMER SUPPORT - 800-305-4436
STAGE 1:
PUSH RIDGE BEAMS TOGETHER, MAKE SURE THERE IS A 2in OVERLAP
OF THE RIDGE CAP
STAGE 2:
INSERT RIDGE CAP JOINER INTO CONNECTED RIDGE CAPS.
MAKE SURE JOINER HAS 8-55/64in IN EACH RIDGE CAP.
PLACE TEK SCREWS IN 2in INCREMENTS FROM SAID END.
REPEAT THIS PROCESS FOR THE OPPOSING HALF OF RIDGE BEAM
INSTRUCTIONS FOR JOINING SPLICED RIDGE BEAM
2"
8-55⁄64in
2in
2"
Premier Garden Shed
- Model: J30232G
INSTRUCTIONAL
VIDEOS