ABSCO INDUSTRIES
Page 21
March 16
INSTRUCTION MANUAL
J23232GK
ROOF INSTALLATION
SECURE THE SCREWS THROUGH THE 49A SHEETS ONLY. THIS WILL ALLOW FOR THE 1ST ROOF
PANEL TO BE MANOEUVRED FOR THE EASE OF INSTALLATION OF THE 2ND ROOF PANEL
PIVOT THE IST ROOF PANEL UPWARDS TO ALLOW FOR
THE 60B CHANNEL TO BE NESTED INTO THE RIDGE BEAM
Summary of Contents for J23232GK
Page 8: ...ABSCO INDUSTRIES Page 8 March 16 INSTRUCTION MANUAL J23232GK ...
Page 9: ...ABSCO INDUSTRIES Page 9 March 16 INSTRUCTION MANUAL J23232GK ...
Page 14: ...ABSCO INDUSTRIES Page 14 March 16 INSTRUCTION MANUAL J23232GK DOOR ASSEMBLIES ...
Page 15: ...ABSCO INDUSTRIES Page 15 March 16 INSTRUCTION MANUAL J23232GK ...
Page 16: ...ABSCO INDUSTRIES Page 16 March 16 INSTRUCTION MANUAL J23232GK DOOR FITTINGS ...
Page 19: ...ABSCO INDUSTRIES Page 19 March 16 INSTRUCTION MANUAL J23232GK WALL ASSEMBLY ...
Page 20: ...ABSCO INDUSTRIES Page 20 March 16 INSTRUCTION MANUAL J23232GK WALL ASSEMBLY ROOF PREPARATION ...
Page 22: ...ABSCO INDUSTRIES Page 22 March 16 INSTRUCTION MANUAL J23232GK ROOF INSTALLATION DOOR HINGING ...
Page 23: ...ABSCO INDUSTRIES Page 23 March 16 INSTRUCTION MANUAL J23232GK ANCHORING ...
Page 24: ...ABSCO INDUSTRIES Page 24 March 16 INSTRUCTION MANUAL J23232GK FINISHING TOUCHES ...