ABSCO INDUSTRIES
Page 17
March 16
INSTRUCTION MANUAL
J23232GK
SECURE THE 39B SHEETS TO THE 54K & 54L CHANNELS PRIOR TO
FASTENING THE 89A JAMBS TO THE 39B SHEETS
FRONT PANEL ASSEMBLY
ALIGN THE EDGE OF THE 89A JAMBS TO BE PARALLEL WITH THE RIDGES ON THE 39B SHEETS - NOTE THAT 54K IS THE TOP CHANNEL FEATURING HOLES FOR THE ROOF
FASTEN THE TOP & BOTTOM SCREWS TO THE
89A JAMBS + 54K/54L CH 39B SHEETS
PRIOR TO SECURING THE MIDDLE SCREWS
NOTCHES ON THE 89A JAMBS ARE TO FIT OVER
THE REAR FACE OF THE 54K & 54L CHANNELS
Summary of Contents for J23232GK
Page 8: ...ABSCO INDUSTRIES Page 8 March 16 INSTRUCTION MANUAL J23232GK ...
Page 9: ...ABSCO INDUSTRIES Page 9 March 16 INSTRUCTION MANUAL J23232GK ...
Page 14: ...ABSCO INDUSTRIES Page 14 March 16 INSTRUCTION MANUAL J23232GK DOOR ASSEMBLIES ...
Page 15: ...ABSCO INDUSTRIES Page 15 March 16 INSTRUCTION MANUAL J23232GK ...
Page 16: ...ABSCO INDUSTRIES Page 16 March 16 INSTRUCTION MANUAL J23232GK DOOR FITTINGS ...
Page 19: ...ABSCO INDUSTRIES Page 19 March 16 INSTRUCTION MANUAL J23232GK WALL ASSEMBLY ...
Page 20: ...ABSCO INDUSTRIES Page 20 March 16 INSTRUCTION MANUAL J23232GK WALL ASSEMBLY ROOF PREPARATION ...
Page 22: ...ABSCO INDUSTRIES Page 22 March 16 INSTRUCTION MANUAL J23232GK ROOF INSTALLATION DOOR HINGING ...
Page 23: ...ABSCO INDUSTRIES Page 23 March 16 INSTRUCTION MANUAL J23232GK ANCHORING ...
Page 24: ...ABSCO INDUSTRIES Page 24 March 16 INSTRUCTION MANUAL J23232GK FINISHING TOUCHES ...