Absco Industries
Assembly Instruction Manual
LARGE GABLE SHED
N3/C1 FRAME KIT
FOR WORKSHOP & UTILITY MODELS
Model: CYCWKUTK
02/03/21
1.3
16
5. Place the door frame against the door, ensure
that it is centred. If the door is already fi tted to the
shed you may need a second person for this step.
Alternatively you can removed the door and refi t it
with pop rivets.
9. Doors require additional padbolts.
predrill and fi x with the following:
Vertical positions
‘B’
and
‘C’
- 1x Padbolt FAST006
- 4x nut FAST005
- 4x bolt FAST004
NOTE: Fit to exterior for double doors.
Horizontal position
‘D’
- 1x Padbolt FAST006
- 1x Door plate 12A
- 1x Hasp FAST007
- 6x Self tapping screws FAST001
10. Drill 10mm holes in the jamb above the
door (ref image
‘B’)
and the channel below
the door (ref image
‘C’).
These align with
the vertical padbolt shafts of double doors.
DOOR BRACING
6. Use tek screws to fi x the frame to the door
at every corner.
7. Continue fi xing at 296mm spacings along
each frame member.
8. Install a third hinge at position
‘A’
, as
shown above. This is the midway point
along the door channel and jamb. pre-drill
the holes with a 3mm drill bit and fi x with 3x
FAST007 pop rivets.
A
B
D
D
C
C
B
B
C