background image

Absco Industries

Assembly Instruction Manual

ABSCO SIGNATURE GAZEBO

MODEL: ADGAZEBO63

6.12m W x 3.11m D x 2.60m H

Model: ADGAZEBO63

4/12/23

1.00

3  

 

 

Beam End 

Cap

Gutter

Gutter 

Stop end

Dropper

80 to 

90 mm 

Adapter

Clip

Check off all components, parts shown are not to scale.

FASTENER PACKS

COMPONENT LIST

AD1 6

QTY CHECK

SB1 2

QTY CHECK

SB2 2

QTY CHECK

2

QTY CHECK

TR36

2

QTY CHECK

TR37

2

QTY CHECK

TR35

3020 mm

3115 mm

Downpipe

80 mm

RWG

21

1

QTY CHECK

2925 mm

2680 mm

5680 mm

3045 mm

3140 mm

3105 mm

1

QTY CHECK

TU

8

QTY CHECK

BK3

1

QTY CHECK

2

QTY CHECK

1

QTY CHECK

2

QTY CHECK

2

QTY CHECK

200

QTY

CHECK

FAST100

200

QTY

CHECK

FAST101

200

QTY

CHECK

FAST102

16

QTY

CHECK

FAST103

48

QTY

CHECK

FAST104

RWG

23

RWG

22

RWG

24

RWG

29

1

QTY CHECK

RWG

27

RWG

25

Gutter 

Bracket

7

QTY CHECK

RWG

26

High side 

Flashing

Foam 

gasket

End 

Flashing

Touch-up 

Paint

Water proof 

Sealant

Insulated 

panel

Z Flashing

6

QTY CHECK

RWG

28

2490 mm

2400 mm

2

QTY CHECK

PT3

2

QTY CHECK

PT4

Short 
posts

Tall 

posts

End 

Beam

Side 

Beam

Summary of Contents for ADGAZEBO63

Page 1: ...www abscosheds com au For construction in non cyclonic areas Wind rating N3 as per AS4055 2021 If you require a higher wind rating please contact us admin absco com au or 1800 029 701 NOTE Concrete s...

Page 2: ...detail to gain a thorough understanding of assembly methods and associated details Unpack and carefully identify and check off all the parts against the parts described and illustrated on Components...

Page 3: ...mm 3115 mm Downpipe 80 mm RWG 21 1 QTY CHECK 2925 mm 2680 m m 5680 m m 3045 m m 3140 mm 3105 mm 1 QTY CHECK TU 8 QTY CHECK BK3 1 QTY CHECK 2 QTY CHECK 1 QTY CHECK 2 QTY CHECK 2 QTY CHECK 200 QTY CHEC...

Page 4: ...post 2 Fasten using four FAST100 tek screws and 5 16 nut setter Make sure screws are inset 20 mm from the edges of bracket for beam clearance To keep the parts aligned while fastening use a clamp or...

Page 5: ...f this manual Drill the holes for the anchors using the post baseplate as a template Use a hammer drill with a 12mm diameter masonry drill bit drill to a depth of 100mm Fasten to foundations with four...

Page 6: ...ke sure the ends of the beam are as far as they can go into the brackets there will be a small gap at the high side due to angle Fasten each end with four FAST100 tek screws as before 6 Repeat these s...

Page 7: ...ely trim flush with a Stanley knife B Check if the steel bottom skin corner is bent down below the bottom face Bend it up with pliers C To increase weather protection turn up the pans 15 degrees with...

Page 8: ...t pan 5 On the middle rib fasten to front beam with another tek 14 x 125 mm FAST104 Fixed panel A Overlap rib B Press here Complete Next panel Bottom skin male female features align FRONT VIEW Laying...

Page 9: ...Bent tab hard up against end Top face sits on two sheet ribs Bottom face covers the Z flashing 15 90 o 0 TR36 flashing will overhang roof panel at the rear and we ll need to trim to make the gutter fi...

Page 10: ...the front end of the structure take one TR37 flashing and place over the front flashing and roof panels as shown 2 Take the second TR37 flashing and place alongside butted against the first trim so i...

Page 11: ...uphill gutter is notched and inside the other 2 Put silicone in the joint and then use two rivets FAST102 per side 3 Take a gutter end stop RWG25 and test fit it over an end of the gutter Mark off the...

Page 12: ...point shown 10 Take a string line and make a line from the high to low point 11 Align the bottom of the gutter bracket with the marks and fasten to rear beam using rivets FAST102 Place middle bracket...

Page 13: ...en and damage Predrilling may be helpful 3 Cut the downpipe to length 4 Place the dropper RWG22 into the top of the downpipe and fasten and seal press into clips and slide up until it touches the unde...

Page 14: ...art 0 General Principles AS NZS 1170 1 2002 Structural Design Actions Part 1 Permanent Imposed Other Actions AS NZS 1170 2 2021 Structural Design Actions Part 2 Wind Actions AS NZS 1170 3 2003 Design...

Reviews: