PAGE 9
ABSCO INDUSTRIES
ASSEMBLY INSTRUCTION - MODEL: 45232WK 24/02/17
Absco Workshop Shed
Model: 45232WK
=
=
=
=
2 X 60AR
2993mm (117.8")
STEP 1. PRE-ASSEMBLY OF SPLICED CHANNELS
2 x 81A
2 x 60A
1 x 55B
1 x 55C
NOTE:
JOIN TOGETHER 20 X CHANNEL SECTIONS USING 10 X CHANNEL JOINERS (PART CSJ)
55CL
55CR
55BR
55BL
60AR
60AL
81AL
81AR
2 X 81AR
2 X 81AL
2 X 60AL
1 X 55BR
1 X 55BL
1 X 55CR
1 X 55CL
NOTE:
SOME CHANNELS HAVE
HOLES IN THEM - YOU WILL NEED
TO RE-DRILL HOLES ON ANY
CHANNEL WHERE THE CSJ
JOINING CHANNEL COVERS
HOLES ON THE CHANNELS
YOU ARE CONNECTING
= 2 x 81C
81CR
81CL
2 X 81CR
2 X 81CL
2253mm (88.7")
= 1 x 55A
55AR
55AL
1 X 55AR
1 X 55AL
= 1 x 81B
81BL
81BR
1 X 81BR
1 X 81BL