Absco Gable Roof Shed Notes

•  1.G This instruction manual shall be read in conjunction with other consultants drawings, specifi cations and 

written instructions provided by Absco and/or their representatives.

•  2.G The drawings provided herein are for installation and structural engineering purposes only.

•  If discrepancies are discovered within the documentation provided, these shall be brought to the attention 

of Absco and written approvals obtained prior to commencing the affected section of work.

•  3.G If in doubt ask.

•  4.G Until approvals from the local authorities are obtained, commencement of construction from these 

drawings shall not commence.

•  5.G Unless varied by the project specifi cation, all materials and workmanship shall be undertaken in 

accordance with the relevant Australian standards and the by-laws and ordinances of the relevant building 
authorities.

•  6.G All dimensions indicated in these drawings shall be verifi ed on site by the installation contractor. Scaling 

of drawings shall not be undertaken.

•  7.G Prior to commencing works on site, the contractor shall verify the position of all services in the area to 

ensure that the construction does not interfere with any of those services.

•  8.G During installation on site the shed structures shall be maintained in a stable condition with no part 

becoming overstressed or permanently deformed.

•  9.G In circumstances where the shed has been installed in a manner which is inconsistent with the installation 

manual, structural certifi cation shall be void.

•  10.G The structural components detailed within this installation manual have been designed for the following 

loads in accordance with AS/NZS1170 based on a Class 10a, Type 2 structure:

•  Roof Live Load: 0.25 kPa uniformly distributed or 1.1 kN concentrated as per AS/NZS1170.1

•  Wind Load: Classifi cation N2, Non-Cyclonic to AS4055 where Vu = 40 m/s, Vs = 26 m/s

Windward wall Cpe = 0.7

Leeward Wall Cp,e = -0.3 to -0.5 as applicable based on shed geometry

Side Wall Cp,e = -0.5 to -0.65 as applicable based on shed geometry

Roof Cp,e = -0.5 to -1.3 depending on wind direction

6-12 Activity St, Acacia Ridge QLD 4110

PO Box 119, Acacia Ridge QLD 4110

AU: 1800 029 701

N Z: 0800 466 444

[email protected]

www.abscosheds.com.au

General

Summary of Contents for 30232GK

Page 1: ...r choosing an Australian made shed For further assistance please visit our detailed instructional video library at Http www abscosheds com au watch videos At ABSCO Industries we are always looking to...

Page 2: ...ignment of parts The shed shall be erected on top of a reinforced concrete slab and anchored down appropriately illustrated on FINAL CONSTRUCTION page TOOLS REQUIRED SAFETY NOTES Some parts may have s...

Page 3: ...4 STEEL SHEET 1725mm X 773mm 67 9 X 30 4 STEEL SHEET 1725mm X 773mm 67 9 X 30 4 STEEL SHEET 1170mm X 773mm 40 1 X 30 4 STEEL SHEET STEEL SHEET STEEL SHEET 1980mm X 773mm 77 9 X 30 4 STEEL SHEET 1785m...

Page 4: ...m 58 9 CHANNEL L 1496 5mm 58 9 CHANNEL L 1496 5mm 58 9 CHANNEL L 1496 5mm 58 9 CHANNEL L 1496 5mm 58 9 CHANNEL L 1126 5 44 3 CHANNEL L 1496 5mm 58 9 55BR 81BR 81AR 81CR 60AR 55AR CHANNEL L 1496 5mm 58...

Page 5: ...HECK QTY QTY 14A 2 12A 2 CAP GABLE L 170mm 6 7 DOOR STRAP L 165mm 6 5 DOOR PADBOLT HASP 2 3 SELF TAPPING SCREWS PACKET CONTAINING 220 1 DOOR PADBOLT 3 16 COUNTERSUNK SCREWS NUTS 12 3 16 ROUND HEAD BOL...

Page 6: ...he channel along the sheets until each end is neatly flush If you need to remove channels from the panels slide it off from the side Channel locks the shed panel into position without the need for scr...

Page 7: ...of the channel where the JOIN text is marked Push down one side of the CSJ until you hear a click Step 3 Join the second channel to the CSJ by positioning the JOIN of the channel at the centre of the...

Page 8: ...n them You will need to redrill holes where CSJ joining channel covers them Join together 20 x channel sections using 10 x channel joiners Part CSJ 2x 81AR 2x 81AL 2x 60AR 2x 60AL 1x 55AR 1x 55AL 1x 5...

Page 9: ...when the beams are in position Step 2 Use the ZARSP to connect at the centre of the two ridge beams Be sure it is pushed in fully Step 3 Turn over the ridge beam Measure 250mm from the middle along t...

Page 10: ...y Instruction Manual ABSCO PREMIER SHED MODEL 30232GK 3 00mW x 2 26mD x 2 00mH Model 30232GK 1 22 10 28 04 2022 PRE ASSEMBLY OF SPLICED RIDGE BEAM 1x 97AL 1x 97AR 1x 97A 2993mm Overall length ZARSP 22...

Page 11: ...ction Manual ABSCO PREMIER SHED MODEL 30232GK 3 00mW x 2 26mD x 2 00mH Model 30232GK 1 22 11 28 04 2022 OVERVIEW OF ROOF COMPONENTS OVERVIEW OF ROOF COMPONENTS 86A 60A 14A 86A 81A 86A 86A 14A 81A 97A...

Page 12: ...ER SHED MODEL 30232GK 3 00mW x 2 26mD x 2 00mH Model 30232GK 1 22 12 28 04 2022 OVERVIEW OF WALL COMPONENTS OVERVIEW OF WALL COMPONENTS 81C 83L 55B 83R 83L 15A 55A 30A 30A 31A 31A 81B 81C 36L 42D 36R...

Page 13: ...ndustries Assembly Instruction Manual ABSCO PREMIER SHED MODEL 30232GK 3 00mW x 2 26mD x 2 00mH Model 30232GK 1 22 13 28 04 2022 REAR PANEL ASSEMBLY 1x required 30A 31A 31A 30A 55B 81B SNAPT TE i SNAP...

Page 14: ...anual ABSCO PREMIER SHED MODEL 30232GK 3 00mW x 2 26mD x 2 00mH Model 30232GK 1 22 14 28 04 2022 ROOF PANEL ASSEMBLY 2x required Fit 81A to edge of sheet with pre punched holes 49A 49A 49A 49A 60A 86A...

Page 15: ...Industries Assembly Instruction Manual ABSCO PREMIER SHED MODEL 30232GK 3 00mW x 2 26mD x 2 00mH Model 30232GK 1 22 15 28 04 2022 SIDE PANEL ASSEMBLY 2x required INSIDE OF SHED 36L 42D 36R 83R 81C 83...

Page 16: ...PREMIER SHED MODEL 30232GK 3 00mW x 2 26mD x 2 00mH Model 30232GK 1 22 16 28 04 2022 FRONT PANEL ASSEMBLY 89A 89A 90A 79A SNAPT TE i SNAPT TE i SNAPT TE i SNAPT TE i 34A 5A 89A 90A 5A 89A 90A 5A 5A 79...

Page 17: ...22 DOOR PANEL ASSEMBLY 58C 58C 58C 12A 58C 58A 58A A B 89C 58B A B SNAP T TE i SNAP T TE i SNAP T TE i SNAP T TE i Vertical door channels are installed in the opposite orientation compared to the hori...

Page 18: ...EMBLY Nuts and bolts may be used instead of pop rivets by drilling out hinge holes using a 4mm drill bit Both are supplied The two holes required to connect the padbolt hasp for each door have not bee...

Page 19: ...The top channels of each panel are pre punched for attaching roof sheeting The base channels are not pre punched Side wall channels fit into the notched rear wall channels Pre punched holes in roof p...

Page 20: ...EL 30232GK 3 00mW x 2 26mD x 2 00mH Model 30232GK 1 22 20 28 04 2022 Secure peak brace to ridge beam and roof panel with one screw at each end INSIDE VIEW OF FIXING Move the other roof panel into posi...

Page 21: ...to the wall sheet Drill a 10mm hole into the concrete Bolt and Nut M10 4 6 S Steel Angle 35 x 35 x 3 M10 Dynabolt Denotes hot dip galvanised finish Wall Sheet Slab 14A Bend the top and bottom flanges...

Page 22: ...the installation contractor Scaling of drawings shall not be undertaken 7 G Prior to commencing works on site the contractor shall verify the position of all services in the area to ensure that the c...

Page 23: ...levant provisions of AS1562 Steelwork 1 F The supporting slab foundation for the garden shed shall be of a minimum size indicated on the installation manual The top surface of the formed slab shall be...

Page 24: ...s of claiming warranty To make a claim under the warranty within the warranty period you will need to contact the manufacturer directly by phone or email Contact Number 1800 029 701 Contact Email admi...

Page 25: ...ions such as extreme heat or cold The product should only be used for storing items such as gardening equipment and should not be used for articles that may be prone to damage if they come into contac...

Reviews: