INSTALLATION AND COMMISSIONING
3
Installation
The machine is ready for installation. After uncrating your spiral mixer,
inspect the machine for any damage that might have occurred during
shipment. Report any damage to us before proceeding. Never attempt to
operate this mixer with damaged parts.
1). Position the mixer in its appropriate working position, the mixer must be
installed on a horizontal and solid floor.
2). Adjust the mixer feet to ensure that the mixer is level, and seat it firmly
on all four corners. Ensure that no wheels touch the ground. The axles
are not designed to support the unit while mixing.
3). Connect the correct power supply to the machine as indicated on the
machine nameplate.
Commissioning
1). Start the mixer to check the direction of rotation of the kneading spiral
and the bowl. When viewed from above, both kneading spiral and bowl
should rotate clockwise. The arrow on the bowl indicates the correct
direction of the bowl. If the rotation direction is incorrect, swap two
phases in the plug (white and black wires) to reverse the rotation
direction.
2). Test the function of the safety emergency stop button. The machine
must stop immediately when you press this button.
3). Test the function of the limit switch for the bowl safety guard. When the
guard is lifted, the machine must stop immediately.
Summary of Contents for ABSFBM-120T
Page 1: ...OWNER S MANUAL ABSFBM 120T Spiral Mixer...
Page 13: ...PARTS LIST 12...
Page 14: ...PARTS LIST 13...
Page 15: ...PARTS LIST 14...
Page 16: ...PARTS LIST 15...
Page 17: ...PARTS LIST 16...
Page 21: ...WIRING DIAGRAM 20...