Checklist to obtain the panel guarantee
The structures, panels and units are properly leveled and anchored.
YES NO
The pipes are properly connected to the interior units and the solar collectors.
YES NO
The photovoltaic connection has been carried out properly, checking the supply
voltage and the electrical protections.
YES NO
The inverter is switched on, tested and without alarms.
YES NO
The equipment installed outside, with the exception of the hybrid solar panels, is
properly protected against direct solar radiation, rain and frost.
YES NO
Circuits and rows are adjusted to their nominal flows and are balanced.
YES NO
In subsystems where the physical properties of the water are changed, it must be
possible to measure at least the inlet and outlet temperatures.
YES NO
Water-tightness and pressure tests have been carried out on water pipe networks.
YES NO
Temperature sensors and probes are properly positioned and connected.
YES NO
The power supply of all equipment is executed and checked.
YES NO
The control system of the installation is programmed and working correctly. At no time
does the hybrid collector exceed 85°C.
YES NO
The hydraulic installation has a heat dissipation system with at least the same total
thermal power of the installation.
YES NO
If the installation includes the aH monitor, the system is fully installed, connected to
the internet and working
YES NO