103.
Remove the clock face (BC), retaining clips (DH) and faceplate (AD) from the
assembled base.
Apply CA glue to the joint between the spacer ring (DF) and the tube.
104.
Press a second spacer ring (DF) onto the previous spacer ring (DF).
Apply CA glue to the joint between the second spacer ring (DF) and the tube.
105.
Press a third spacer ring (DF) onto the second spacer ring (DF).
106.
Slip a fourth spacer ring (DF) onto the third spacer ring (DF). Do not glue.
This ring may be removed and sanded to provide the correct fit between the winder
wheel and the frame.
Summary of Contents for SEBRINGVILLE 3157826
Page 3: ...2 The kit also contains a number of other components needed to complete the clock...
Page 4: ...3 The tools needed to assemble this kit are Razor saw 42 teeth per inch Scissors...
Page 21: ...10 Repeat the previous six steps to create a second long spacer assembly...
Page 47: ...69 Press the long spacer assembly onto the pinion AE 70 This completes the escape wheel...
Page 71: ...133 Place the winder wheel in the hole marked with a club...
Page 72: ...134 Slip the dial face BC under the idler gear...
Page 81: ...146 Apply CA glue to the hole in the pallet backing plate BJ...
Page 82: ...147 Align the hole in the crutch BI and the hole in the pallet backing plate BJ...
Page 84: ...149 Trim and sand the axle pin flush with the surface of the pallet backing plate BJ...
Page 89: ...154 Install the second wheel into the hole marked with a triangle...
Page 90: ...155 Install the faceplate AD using the dial face BC and retainer clips DH...
Page 92: ...160 Thread the free end of the counterweight cord through the counterweight pulley as shown...
Page 93: ...161 Slide the knotted end of the counterweight cord into the counterweight anchor as shown...
Page 97: ......