EN - 14
BAL.0713.0 • 2019-02-11
6 Commissioning
TCS-FP
6.5 Electrical connection
The torch cleaning station is connected to the power supply via an integrated plug-in connection. The necessary control
signals are also transmitted via this plug.
6.6 Injection unit
Before operating the device, a rubber seal that is compatible with the welding torch gas nozzle must be mounted. Details of
the gas nozzle diameters for which the rubber seal is suitable can be found on the rubber seal
.
Fig. 5
Electrical connection
5
4
3
2
6
1
1: GND - Power Supply
2: 24V - Power Supply
3: Ready out (24V)
4: Start in (24V)
5: Optional injection
6: Cutting pliers (24V)
NOTICE
• Before setting up the injection unit, please check that a compatible gas nozzle seal is being used. This depends on the
gas nozzle diameter used.
• Inflowing compressed air sucks in the anti-spatter fluid and mixes it with the compressed air flow.
Recommendation: The period needed to sufficiently wet the gas nozzle/welding torch should not exceed 2-3 seconds.
1
Injection unit cover
2
Rubber seal for gas nozzle seal
3
Thrust ring
4
Injection unit, complete
5
Adjusting screw for anti-spatter
fluid dosing
Fig. 6
Injection unit
1
2
3
4
5
Summary of Contents for TCS-FP
Page 4: ...DE 4 BAL 0713 0 2019 02 11 1 Identifikation TCS FP ...
Page 5: ...TCS FP 1 Identifikation BAL 0713 0 2019 02 11 DE 5 ...
Page 34: ...EN 4 BAL 0713 0 2019 02 11 1 Identification TCS FP ...
Page 35: ...TCS FP 1 Identification BAL 0713 0 2019 02 11 EN 5 ...
Page 64: ...ES 4 BAL 0713 0 2019 02 11 1 Identificación TCS FP ...
Page 65: ...TCS FP 1 Identificación BAL 0713 0 2019 02 11 ES 5 ...