EN - 16
BAL.0533.0 • 2019-11-15
9 Maintenance and cleaning
FEC
9 Maintenance and cleaning
Scheduled maintenance and cleaning are prerequisites for a long service life and trouble-free operation.
9.1 Maintenance intervals
The fume extraction system must be cleaned and inspected as part of maintenance by qualified personnel. Any dirty parts
that cannot be cleaned adequately must be replaced. These dirty parts must be placed in bags that are impermeable (so
dust cannot escape) and disposed of in accordance with regulatory stipulations.
DANGER
Risk of injury due to unexpected start
The following instructions must be followed during all maintenance, servicing, assembly, disassembly, and repair work:
• Switch off the FEC fume extraction system.
• Close off the compressed air supply.
• Disconnect all electrical connections.
WARNING
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed, or worn parts.
NOTICE
• Before performing any maintenance and cleaning work, suitable safety measures must be taken.
• Maintenance and cleaning work on the fume extraction system may only be carried out in areas with locally filtered
forced ventilation.
• Only qualified personnel are permitted to perform work on the device or system.
• Check and wear your personal protective equipment.
• Personal protective equipment consists of protective clothing, safety goggles, a class P3 respiratory mask, protective
gloves and safety shoes.
NOTICE
• The specified maintenance intervals are standard values and refer to single-shift operation.
• We recommend recording the inspections. The date of the inspection, the detected defects and the name of the
inspector must be recorded.