ABERLINK LTD
|
VATCH LANE
|
EASTCOMBE
|
GLOUCESTERSHIRE
|
GL6 7DY
|
UK
Tel : +44 (0)1453 884461
|
Fax : +44 (0)1453 882348
|
Email : [email protected]
|
Web : www.aberlink.com
Registered in England No. 7642245
|
VAT Registration No. GB 108 3075 37
Once this panel is removed you can unload the parts, starting with the bridge. Use the
packaging to place the bridge on whilst setting up machine.
Notice in this picture the z axis is still being
supported. Also place some foam under the x axis
so that the back of the carriage is not touching the
floor. Also notice the supports on the bridge for
transit.
Bench, and all loose
packages including the pc
controller, covers etc.
Granite base located at the
bottom of the crate
Carriage is tightly strapped
in two positions
Transit screws lock the z
axis, two screws which
have tags on retain a piece
of plastic which clamps the
z quill