88
Figure 80: Power troubleshooting flowchart
Power supply test
Various equipment configurations will necessitate moving to one or more additional tests from this location.
Step-by-step instructions
Check that the power supply voltage setting, the power supply current rating, and the cables used for the installation meet
the recommended requirements.
If this is a new installation and external equipment is being powered from the XRC
G4
, call Totalflow Technical Support for
help in evaluating the cable and power supply installation requirements.
Correct and retest as necessary.
Go To
Power Supply
Test
START
RETURN
Go To
TFIO Module
Isolation Test
Go To
Remote COMM
Test Chart
Power Issue
Located?
YES
NO
Return to Test
Sequence
Perform
Isolation Tests
Sequentially as
Required
END
Go To
Auxiliary
Equipment
Power Isolation
Test
Go To
AC Charging
System Test
Go To
Solar Panel
Charging
System Test
AC Charging
System ?
YES
NO