46 Planning and Installation Guidelines
Planning and
Installation Guidelines
Technical Description
Wireless Proximity Switches / Issue: 09.2004
V 6
4.4 Comissioning
The commissioning of the power supply of one setup or a machine is carried out in the following
steps:
•
Connect the primary loops to the power supplies.
•
Connect the sync-cables, starting at the master device, one after the other to the Slave devices,
by connecting the output of one device with the following input.
•
Chose “Master” operation mode at the first device, “Slave” at all other devices and choose a
phase value (0°/90°) matching the orientation in relation to the “Master” primary loop.
•
Choose the appropriate current value matching the size of the connected primary loop(s) for
each power supply.
•
Connect the alarm/error-output with a suited alarm-input of the control system.
•
Connect all power supplies of the setup, so that they can be switched with one main switch.
•
Connect the external PE-connections of the power supplies (star configuration).
•
Tighten all the glands.
•
Mount the cover on the terminal board.
•
Switch on the mains voltage.
•
The operation LEDs of the connected power supplies start to blink green.
The power supplies are in normal operation if their green LEDs are continuously on (after ~20-30
seconds).
The housing, especially the heat sinks, of the power supplies heat up considerably in operation.