Mechanical tests
Product safety
EMC compliance
Radio equipment conformance
Description
Reference
Requirement
Vibration response
IEC 60255-21-1: 1988
IEC 60068-2-6: 2007
Class 1
Vibration
endurance
IEC 60255-21-1: 1988
IEC 60068-2-6: 2007
Class 1
Shock response
IEC 60255-21-2: 1988
IEC 60068-2-27: 2008
Class 1
Shock witstand
IEC 60255-21-2: 1988
IEC 60068-2-27: 2008
Class 1
Bump
IEC 60255-21-2: 1988
IEC 60068-2-29: 1987
Class 1
Description
Reference
LV directive
2014/35/Eu
Standard
EN 61010 (2010)
Description
Value
EMC directive
2014/30/EU
Standard
EN 301 489-1 V2.2.3
EN 301 489-17 V3.1.1
EN 55032:2015 +A11:2020
EN 55035:2017
EN 61000-3-2:2019
EN 61000-3-3:2013+A1:2019
Description
Reference
RE directive
2014/53/EU
Standard
EN 300 328 V2.2.2
EN 62311:2008
5.3 Serial communication
parameters
• MDC4-M-M: Modbus Slave.
• Transmission mode: Modbus RTU.
• Physical interface: Two-wireRS-485.
• Transmission Type: Asynchronous serial
communication, Byte unit.
• Serial link: TIA/EIA 485-A.
• Baud rate: 9600bps, Frozen.
• Data format: 10bits: 1start bit, 8 data bits, 1stop
bits, no parity bits.
• Address: Slave address 0-247
(1 = default, 0 = broadcast address), can be set
through local HMI.
WARNING
The following operations require access to
the cable compartment. Before entering,
make sure the switch and disconnector (if any) are in
open position. Check that the cables are de-energized
and that the grounding disconnector is closed.
Prevent any feeding from the cables.
For operations requiring low voltage compartment
maintenance, make sure the cell is de-energized
before entering.
NOTE
• Please refer to the operation and maintenance
manual 1VFM200005 for information on
tightening torques.
• For maintenance activities, use the tools given in
par 4.1 of operation and maintenance manual
1VFM200005
• For electrical applications, refer to the wiring
diagram included with the switchboard
• For electrical applications, check after
installation that electrical wires are not in
contact with moving parts
• Le seguenti operazioni possono essere svolte solo
dopo aver eseguito un training di livello L2 per
manutentori di equipaggiamento in sito. Contattare
ABB per ulteriori informazioni.