
I N S TA L L AT I O N , O P ER AT I O N S A N D M A I N T EN A N C E M A N UA L
7
Receiving inspection
Upon receiving SmartRack™ MV, carefully unpack
the device from its box and check for the following
components which are fully furnished in the
assembled unit:
Should any parts be missing, please contact your
ABB sales representative.
Next, plug the device into an appropriate source
of power. See the Electrical Specifications section
for power requirements. With the device plugged
in, locate the On/Off switch on the top of the cart
and turn it to the On position. Both the green
indicator lights should illuminate. The lights show
incoming power to the device and the status of the
main power supply.
—
Receiving and storage
—
Table 1: Receiving inspection
—
03
On switch and
indicator lights
—
04
Start-up screen
—
03
Locate the Remote Control Box and make sure the
screen of the controller is properly displaying the
start-up screen as shown in Figure 5 below. If the
screen does not appear or does not look like Figure 5,
check all cable connections. If the start-up screen
does not appear after checking the connections,
do not use SmartRack™ MV and contact ABB
product support.
Handling the device
Plastic handles have been provided at multiple
places on the device to facilitate handling. These
should be used whenever possible to avoid
damage.
The cart includes a swinging push/pull bar with
plastic grip.
Component
Quantity
Cart
1
Motor Box
1
Control Box
1
25 or 50ft. Connection Cable
2
Power Cable
1
Fuse
2
Socket Extension
1
—
04
SmartRack
MV
Summary of Contents for SmartRack MV
Page 2: ......
Page 23: ...INSTALL ATION OPER ATIONS AND MAINTENANCE MANUAL 23 ...