4 4 1 Install in the rack position
Step 1: Install mounting ears to the side mounting holes of the EBM using the screws
provided, mounting ears should face forward. Please refer to the below diagram.
—
4.4.1-1
Step 2: Lift the EBM and slide it into the rack enclosure. Install the EBM to the rack with
screws, nuts through its mounting ears and into the rack rails. Please refer to the below
diagram
—
4.4.1-2
—
4 4 2 Install in the tower position
Step 1: Prepare the tower feet (UPS accessary) and extension feet, the extension feet
depend on your system configuration. (Tower feet=2U, long extension=2U, short
extension=1U). Please refer to the below diagram.
—
4.4.2-1
Step 2: Place EMBS (optional), UPS, EBM, and ISO TX (optional) on tower feet assembly.
Please refer to the below diagram.
—
4.4.2-2
—
4.4.1-1
Step 1
—
4.4.1-2
Step 2
—
4.4.2-1
Step 1
—
4.4.2-2
Step 2