ABB RT G2 5-10 kVA UL User Manual Download Page 1

USER MANUAL

External battery module 

For RT G2 5-10 kVA UL

PREPARED: Elvan Chen

STATUS  

SECURITY LEVEL: Public 

Approved  

APPROVED: Patricia Kuenzle

DOCUMENT KIND: Operating manual 

OWNING ORGANIZATION: 

DOCUMENT ID: 4NWD005661 REV: A

LANG: EN

PAGE:

1 / 20

ABB Switzerland Ltd.
© Copyright 2022 ABB. All rights reserved.

Summary of Contents for RT G2 5-10 kVA UL

Page 1: ...10 kVA UL PREPARED Elvan Chen STATUS SECURITY LEVEL Public Approved APPROVED Patricia Kuenzle DOCUMENT KIND Operating manual OWNING ORGANIZATION DOCUMENT ID 4NWD005661 REV A LANG EN PAGE 1 20 ABB Switzerland Ltd Copyright 2022 ABB All rights reserved ...

Page 2: ...utside of the European Union 5 1 5 Certification standards 6 2 Introduction 7 2 1 Environmental protection 7 2 1 1 Substances 7 2 1 2 Packing 7 3 General characteristics 8 3 1 Rear Panel View 8 4 Installation 9 4 1 Inspecting the equipment 9 4 2 Unpacking the Unit 9 4 3 Check the inside package 10 4 4 Installing the EBM 10 4 4 1 Install in the rack position 11 4 4 2 Install in the tower position 1...

Page 3: ...ing and user instructions THIS SYMBOL IN CONJUNCTION WITH THE SIGNAL WORD DANGER INDICATES AN IMMINENT ELECTRICAL HAZARD FAILURE TO OBSERVE THE RELATED SAFETY NOTE MAY CAUSE INJURY DEATH OR EQUIPMENT DAMAGE THIS SYMBOL IN CONJUNCTION WITH THE SIGNAL WORD WARNING INDICATES A POTENTIALLY DANGEROUS SITUATION FAILURE TO OBSERVE MAY CAUSE INJURY DEATH OR EQUIPMENT DAMAGE THIS SYMBOL INDICATES A SAFETY ...

Page 4: ...ank 20 cm away from the wall NOTE Make sure the battery bank is installed within the proper environment as specified 0 40 C 32 F 104 F and 5 95 non condensing humidity NOTE Do not install the battery bank under direct sunlight Your warranty will be void if the batteries fail due to overheating NOTE This battery bank is designed for indoor use only NOTE This battery bank is not designed for use in ...

Page 5: ... working on batteries 1 Remove watches rings or other metal objects 2 Use tools with insulated handles 3 Wear rubber gloves and boots 4 Do not lay tools or metal parts on top of batteries 5 Disconnect charging source prior to connecting or disconnecting battery terminals DANGER Do not plug or unplug the battery connector if UPS works in DC discharging mode 1 4 UPS disposal and recycling 1 4 1 For ...

Page 6: ...R LOCAL AUTHORITIES OR DEALER AND ASK FOR THE CORRECT METHOD OF DISPOSAL CORRECT WASTE DISPOSAL OF THIS PRODUCT WILL HELP SAVE VALUABLE RESOURCES AND PREVENT ANY POTENTIAL NEGATIVE EFFECTS ON HUMAN HEALTH AND THE ENVIRONMENT WHICH COULD OTHERWISE ARISE FROM INAPPROPRIATE WASTE HANDLING 1 5 Certification standards Safety UL 1778 CSA 107 3 IEC 61000 4 2 ESD level 3 Radiated FCC CFR 47 Part 15 Class ...

Page 7: ... products are developed using the eco design approach 2 1 1 Substances This product does not contain CFCs HCFCs or asbestos 2 1 2 Packing To improve waste treatment and facilitate recycling separate the various packing components The cardboard we use comprises over 50 recycled cardboard Sacks and bags are made of polyethylene Packing materials are recyclable and bear the appropriate identification...

Page 8: ...022 ABB All rights reserved 3 General characteristics NOTE BEFORE INSTALLATION PLEASE INSPECT THE UNIT ENSURE NOTHING IS DAMAGED INSIDE THE PACKAGE PLEASE KEEP THE ORIGINAL PACKAGE IN A SAFE PLACE FOR FUTURE USE 3 1 Rear Panel View No Item 1 EBM Breaker 2 Downstream EBM connector output 3 Upstream EBM connector input 3 1 1 Rear Panel View 3 1 1 ...

Page 9: ...IGHT TAKE THE NECESSARY PRECAUTIONS 4 2 Unpacking the Unit DANGER UNPACKING THE UNIT IN A LOW TEMPERATURE ENVIRONMENT MAY CAUSE CONDENSATION TO FORM BOTH INSIDE AND ON THE CABINET DO NOT INSTALL THE UNIT UNTIL THE INSIDE AND OUTSIDE OF THE UNIT ARE DRY RISK OF ELECTRIC SHOCK NOTE IF ANY EQUIPMENT HAS BEEN DAMAGED DURING SHIPMENT KEEP THE SHIPPING CARTONS AND PACKING MATERIALS FOR THE CARRIER OR PL...

Page 10: ...lling the EBM It is necessary to select a proper environment to install the unit in order to minimize the possibility of damage to the battery bank and extend the life of the batteries Please follow the instructions below 1 Keep at least 20cm 8 inches clearance from the rear panel of the unit from the wall or other obstructions 2 Do not block the airflow to the ventilation openings of the unit 3 P...

Page 11: ...and slide it into the rack enclosure Install the EBM to the rack with screws nuts through its mounting ears and into the rack rails Please refer to the below diagram 4 4 1 2 4 4 2 Install in the tower position Step 1 Prepare the tower feet UPS accessary and extension feet the extension feet depend on your system configuration Tower feet 2U long extension 2U short extension 1U Please refer to the b...

Page 12: ...ights reserved 4 4 3 Connecting with UPS and Other Battery Pack Follow the below installation diagram to connect the UPS with other battery pack s Second battery pack by cable NOTE REMOVE THE BATTERY CONNECTOR COVER BEFORE CONNECTING WITH UPS AND OTHER BATTERY PACK UPS First battery pack Second battery pack 4 4 3 1 4 4 3 1 Connecting with UPS and Battery Pack ...

Page 13: ...WARNING THE EQUIPMENT SHOULD BE INSTALLED BY SERVICE PERSONNEL WHEN INSTALLING THE BATTERIES USE THE SAME NUMBER AND TYPE OF BATTERIES SHOWN IN THE BATTERY LABEL DO NOT OPEN OR MUTILATE THE BATTERY OR BATTERIES RELEASED ELECTROLYTE IS HARMFUL TO THE SKIN AND EYES A BATTERY CAN PRESENT A RISK OF ELECTRIC SHOCK AND HIGH SHORT CIRCUIT CURRENT THE FOLLOWING PRECAUTION SHOULD BE OBSERVED WHEN WORKING O...

Page 14: ...d SECURITY LEVEL Public DOCUMENT ID 4NWD005661 REV A LANG EN PAGE 14 20 Copyright 2022 ABB All rights reserved Step 3 Place the battery into the bottom case and then assemble the battery fixing plates with screws back on bottom case as below diagram 5 3 5 3 Step 3 ...

Page 15: ...Y MODULE FOR RT G2 5 10 KVA UL STATUS Approved SECURITY LEVEL Public DOCUMENT ID 4NWD005661 REV A LANG EN PAGE 15 20 Copyright 2022 ABB All rights reserved Step 4 Connect the battery wire as below diagram 5 4 5 4 Step 4 ...

Page 16: ...gram 5 5 Battery wire list Model Number of the Wire Quantity Wire Specification Wire Length mm Wire Length inches Ext batt case Ext batt module W1 12pcs AWG10 BLK 75mm 3 inches W2 4pcs AWG10 BLK 380mm 15 inches W3 1pcs AWG10 RED 620mm 24 5 inches W4 1pcs AWG10 BLK 260mm 10 25 inches W5 1pcs AWG10 BLK 200mm 8 inches W6 1pcs AWG10 BLK 200mm 8 inches W7 1pcs AWG10 BLK 250mm 10 inches W8 1pcs AWG10 RE...

Page 17: ...ion D x H x W 632 x 131 x 438mm 24 84 x 5 16 x 17 28 inches Net Weight 72kgs 158 7 lbs with battery 16kgs 35 2 lbs without battery Package Dimension D x H x W 870 x 250 x 580mm 34 2 x 9 84 x 22 8 inches Gross Weight 82kgs 180 8 lbs with battery 26kgs 57 3 lbs without battery 6 3 Certifications ESD IEC 61000 4 2 Level 3 Low Frequency Signals IEC 61000 2 2 RS IEC 61000 4 3 Level 3 EFT IEC 61000 4 4 ...

Page 18: ...umidity 5 to 95 Relative Humidity Non condensing Operating Temperature 0 C to 40 C 32 F 104 F Storage Temperature 15 C to 40 C 5 F 104 F Altitude 1000m 3281ft for Nominal power Over 1000m 3281ft the power de rating is 1 every 100m 328ft 4000M 13123ft max Acoustic Noise 50 dB max Minimum Clearances from other cabinet 25cm 1inch for front and rear side 0cm for left and right side IP grade IP20 ...

Page 19: ...n exceeded the batteries must be replaced In this case please contact your dealer Be sure to deliver the spent battery to a recycling facility or ship it to your dealer in the replacement battery packing material 7 1 Storage Before storing charge the unit 5 hours Store the unit covered and upright in a cool dry location During storage recharge the battery in accordance with the following table Rec...

Page 20: ... Copyright 2022 ABB All rights reserved Specifications subject to change without notice ABB Switzerland Ltd Via Luserte Sud 9 6572 Quartino Switzerland www abb com ups https library abb com ...

Reviews: