IEC17000158-1-en.vsdx
IEC17000158 V1 EN-US
Figure 16: IED summary
8.3
Removing the IED
GUID-6F99E661-D319-4782-97E9-3A864B1E972D v2
Before removing the IED, make sure that auxiliary power is turned off and all wiring is
disconnected.
For upgrade purposes the IED does not need to be removed. Before removing
the IED check with your local ABB office if the IED can be upgraded.
8.4
Sending the IED for repair
AMU0600445 v4
In case of product problems, contact the nearest ABB office or representative for consultation
and instructions.
8.5
Exchanging the IED
GUID-1EB39784-696C-4B2E-B560-4115F721DCAB v9
To exchange the IED with another identical unit, remove the IED and install the new one.
Contact your local ABB for information about exchangeable units.
Section 8
1MRK 514 030-UEN B
Removing, repairing and exchanging
36
Switchgear control unit SAM600-IO
Installation manual
© Copyright 2017 ABB. All rights reserved