7.4
Creating report control blocks with the IEC 61850
Configuration tool
1.
Select the
IED
node in
Plant Structure
in
Project Explorer
.
2.
Click the
Report Controls
tab.
3.
Right-click the area containing the existing report control blocks and select
New
to add a new report control block.
GUID-184CB65D-000A-4825-965A-406BF345C7AB V1 EN
Figure 58:
Adding a new report control block
4.
Browse to LLN0 under LD0 to define where to place the report control block.
5.
Give a unique name to the report control block.
6.
In the drop-down list, select the previously created data set to link with the GCB.
Section 7
1MRS757809 C
Engineering of event reporting with PCM600
90
REC615 and RER615
Engineering Guide