IEC15000432-2-en.vsdx
jX(Ohm/phase)
RLd
RLd
RFPPStart
RFPPStart
X1Start
P2
P1
P3
P4
P8
P9
P 10
P11
P 13
P 14
P 15
P16
P7
P5
P6
P12
R(Ohm/phase)
IEC15000432 V2 EN-US
Figure 16:
Proposed test points for phase-to-phase loop of quadrilateral characteristic in
solidly earthed system
Table 18:
Test points for phase-to-phase loop of quadrilateral characteristic in solidly earthed system
Test point
R
X
Comment
P1
0
X1Start
P2
(
X1Start
/ tan(
LineAng
))
X1Start
P3
RFPPStart
0.8
∗
X1Start
P4
0.8
∗
RFPPStart
0.8
∗
RFPPStart
∗
tan(
ArgLd
)
P5
RLd
0
P6
RFPPStart
0
If
OpLoadEnch
=
Off
P7
0
-
X1Start
P8
-(
X1Start
/ tan(
LineAng
))
-
X1Start
P9
-
RFPPStart
-0.8
∗
X1Start
P10
-0.8
∗
RFPPStart
-0.8
∗
RFPPStart
∗
tan(
ArgLd
)
P11
-
RLd
0
P12
-
RFPPStart
0
If
OpLoadEnch
=
Off
P13
0.8
∗
RFPPStart
-0.8
∗
RFPPStart
∗
tan(
ArgLd
)
Table continues on next page
1MRK 506 377-UEN Rev. K
Section 10
Testing functionality by secondary injection
Railway application RER670
79
Commissioning manual
© 2017 - 2021 Hitachi Power Grids. All rights reserved