For IEC 61850-8-1 redundant communication according to IEC62439–3 Edition 2,
port LAN_1A and LAN_1B is utilized.
Redundant communication according to IEC62439–3 Edition 1 and
IEC 61850–9–2LE process bus communication are not supported in
the 650 Ver 1.3 series IEDs.
6.13.1.2
Setting the station communication
To enable the IEC 61850 communication, the corresponding COM03 ports must be
activated. Port LAN1 A and LAN1 B are used for redundancy.
If COM03 is used; the following below apply. If COM05 is used; there is no
redundancy and the port is named LAN1 or (FRONT)
To enable IEC 61850 station communication:
•
The IEC 61850-8-1 station communication functionality must be configured in
the local HMI. Navigate to
Main Menu/Configuration/Communication/TCP-
IP configuation/ETHLAN1_AB
and set the
OperationMode
parameter to
NonRedundant(A)
or, for redundant communication, to
PRP(A+B)
.
•
To enable GOOSE communication, the
Operation
parameter for the
corresponding GOOSE function blocks (GOOSEBINRCV and
GOOSEINTLKRCV) must be set to
On
in the application configuration.
•
To enable GOOSE communication via the front port the parameter
GOOSE
in
Main menu/Configuration/Communication/Station communication/
IEC61850-8-1/PortSelGOOSE
must be set to
Front
. To enable GOOSE
communication via rear port the parameter
PortSelGOOSE
must be set to
LAN1
.
To enable IEC 61850 station communication:
1.
Enable IEC 61850-8-1 (substation bus) communication for port A and B.
1.1. Set values for ETHLAN1_AB.
Navigate to
Main Menu/Configuration/TCP-IP configuation/
ETHLAN1_AB
.
Set values for
OperationMode
,
IPAddress
and
IPMask
.
OperationMode
must be set to
NonRedundantA
.
Check that the correct IP address is assigned to the port.
1.2. Enable IEC 61850-8-1 communication.
Navigate to
Main menu/Settings/General settings/Communication/
Station communication/IEC 61850-8-1
.
Set
Operation
to
On
and
PortSelGOOSE
to the port used.
2.
Enable redundant IEC 61850-8-1 communication for port A and B.
2.1. Enable redundant communication.