![ABB REG316 4 Series Operating Instructions Manual Download Page 380](http://html.mh-extra.com/html/abb/reg316-4-series/reg316-4-series_operating-instructions-manual_4778380.webp)
ABB Switzerland Ltd
REG 316*4 1MRB520049-Uen / Rev. F
3-342
E. Setting instructions
General:
The disturbance recorder function may only be configured
once for each set of parameters.
The special “disturbance recorder” function serves to record cur-
rent and voltage waveforms and measured function variables
when a protection function picks up. A battery buffered 64 kByte
memory is provided for this purpose, which enables 9 analogue
and 8 binary signals to be recorded within a maximum of approx.
5 seconds.
To ensure that the memory is not filled by useless data, record-
ing only takes place after a starting signal (trigger signal). Each
time a start signal is generated, the data are recorded for a pre-
defined time and saved as an “event”. Thus depending on the
definitions of the relevant times, the memory has capacity for
between 1 and approx. 56 events.
To enable the circumstances leading up to an event and also the
responses after an event to be studied, an event comprises
three parts, the pre-event data (recorded before the start signal),
the data of the event itself and the post-event data. The dura-
tions of these three periods can be independently defined.
How the data prior to an event is obtained requires a little more
explanation. Data are continuously recorded from the instant the
programming of the perturbograph function has been completed.
They are fed into a ring shift register, the older data at the
beginning being overwritten as soon as the register is full. This
cyclic overwriting of the ring register continues until a start signal
initiates the recording of an event (trigger signal). Thus the cir-
cumstances immediately prior to the actual event are available in
the ring register.
The duration of the record of the actual event is determined by
the tripping signal (trigger signal), i.e. recording continues for as
long as it is active (recording mode A). If the tripping signal is
very short, recording lasts for at least 100 milliseconds and if it is
very long, recording is discontinued upon reaching the maximum
duration (set event time). A second mode of operation is also
provided (recording mode B), for which the duration of recording
always equals the set event time regardless of the duration of
the trigger signal.
Summary of Contents for REG316 4 Series
Page 4: ......
Page 6: ......
Page 90: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 52 ...
Page 96: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 58 ...
Page 108: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 70 ...
Page 116: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 78 ...
Page 142: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 104 ...
Page 148: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 110 ...
Page 154: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 116 ...
Page 176: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 138 ...
Page 182: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 144 ...
Page 190: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 152 ...
Page 216: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 178 ...
Page 234: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 196 ...
Page 256: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 218 ...
Page 330: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 292 ...
Page 338: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 300 ...
Page 342: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 304 ...
Page 348: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 310 ...
Page 352: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 314 ...
Page 356: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 318 ...
Page 360: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 322 ...
Page 366: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 328 ...
Page 370: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 332 ...
Page 374: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 336 ...
Page 388: ...ABB Switzerland Ltd REG 316 4 1MRB520049 Uen Rev F 3 350 ...
Page 427: ...REG 316 4 1MRB520049 Uen Rev B ABB Switzerland Ltd 4 29 Fig 4 13 Locus of the load angle d 90 ...
Page 444: ......
Page 626: ......
Page 628: ......
Page 684: ......
Page 688: ......
Page 802: ......
Page 810: ......
Page 824: ......
Page 825: ......
Page 826: ......
Page 827: ......
Page 828: ......
Page 829: ......
Page 830: ......
Page 831: ......
Page 832: ......
Page 833: ......
Page 834: ......
Page 835: ......
Page 836: ......
Page 837: ......
Page 838: ......
Page 839: ......
Page 840: ......
Page 841: ......
Page 842: ......
Page 843: ......
Page 844: ......
Page 845: ......
Page 846: ......
Page 847: ......
Page 848: ......
Page 849: ......
Page 850: ......
Page 851: ......
Page 852: ......
Page 853: ......
Page 854: ......
Page 855: ......
Page 856: ......
Page 857: ......
Page 858: ......
Page 859: ......
Page 860: ......
Page 861: ......
Page 862: ......
Page 863: ......
Page 864: ......
Page 865: ......
Page 866: ......
Page 867: ......
Page 868: ......
Page 869: ......
Page 870: ......
Page 871: ......
Page 872: ......
Page 873: ......
Page 874: ......
Page 875: ......
Page 876: ......
Page 877: ......
Page 878: ......
Page 879: ......
Page 880: ......
Page 881: ......
Page 882: ......
Page 883: ......
Page 884: ......
Page 885: ......
Page 886: ......
Page 887: ......
Page 888: ......
Page 889: ......
Page 890: ......
Page 891: ......
Page 892: ......
Page 893: ......
Page 894: ......
Page 895: ......
Page 896: ......
Page 897: ......
Page 898: ......
Page 899: ......
Page 900: ......
Page 901: ......
Page 902: ......
Page 903: ......
Page 904: ......
Page 905: ......
Page 906: ......
Page 907: ......
Page 908: ......
Page 909: ......
Page 910: ......
Page 911: ......
Page 912: ......
Page 913: ......
Page 914: ......
Page 915: ......
Page 916: ......
Page 917: ......
Page 918: ......
Page 919: ......
Page 920: ......
Page 921: ......
Page 922: ......
Page 923: ......
Page 924: ......
Page 925: ......
Page 926: ......
Page 927: ......
Page 928: ......
Page 929: ......
Page 930: ......
Page 931: ......
Page 932: ......
Page 933: ......
Page 934: ......
Page 935: ......
Page 936: ......
Page 937: ......
Page 938: ......
Page 939: ......
Page 940: ......
Page 941: ......
Page 942: ......
Page 943: ......
Page 944: ......
Page 945: ......
Page 946: ......
Page 947: ......
Page 948: ......
Page 949: ......
Page 950: ......
Page 951: ......
Page 952: ......
Page 953: ......
Page 954: ......
Page 955: ......
Page 956: ......
Page 957: ......
Page 958: ......
Page 959: ......
Page 960: ......
Page 961: ......
Page 962: ......
Page 963: ......
Page 964: ......
Page 965: ......
Page 966: ......
Page 967: ......
Page 968: ......
Page 969: ......
Page 970: ......
Page 971: ......
Page 972: ......
Page 974: ......
Page 976: ......