5. Configuration of the LV board 

 

 

 

 

 

 

 

If only the HV board is changed, the softstarter is ready to start. If the LV board is changed, a 

programming of this must be done before the softstarter can be taken in operation. Every softstarter 

size has its own parameter values for the LV board according to table 1 or 2 that must be used. 

Follow the step by step instruction below to do this set-up. 

 

 

 

1.

 

Switch on the power supply (terminal 1 and 2).  

 

2.

 

Enter the menu 

Service settings

 using following path:

 

Menu / SETTINGS / Service Settings / New PCB and press 

Select

 

 

 

3.

 

Press 

Yes

 on the question “Are you sure?” 

 

4.

 

Set the required display language. Press 

Store

 to save the value and press 

Next

 to continue. If 

wrong language was selected press 

Back

 for previous level. These commands are valid for 

the whole set-up. 

 

 

5.

 

Set the parameter CT Ratio Ir. (table 1 or 2) 

 

6.

 

Set the parameter Int ByPass. (table 1 or 2) 

 

 

7.

 

Set the parameter ByPass AC3. (table 1 or 2) 

 

8.

 

Set the 4 parameters SOP1 - SOP4. (table 1 or 2) 

 

9.

 

Set the parameter PST(B). (table 1 or 2) 

 

 

10.

 

After pressing 

Next

 when the parameter PST(B) is set, the programming is complete. 

 

11.

 

Before taking the softstarter in operation, don’t forget to set the rated motor current and 

activate the required protections, warnings, input / outputs etc. 

 

12.

 

For set-up of Torque Control during start and stop see separate manual sheet or update 

manual. 

 

 

 

 

 

Summary of Contents for PST30

Page 1: ...Softstart Upgrade to Torque control PST30 300 PSTB370 1050 1SFC132040M0201 RevA Dec 06 Contents 1 ESD Warning 2 2 Tools 2 3 PCB information 2 4 Step by step 3 5 Configuration of the LV board 7...

Page 2: ...rson walking on a carpet can be charged with up to fifteen thousand volt 15000V Compare this with the fact that some sensitive components can be destroyed when discharged on a much lower level about 1...

Page 3: ...ge the tools and yourself by touching earth if you are not earthed 6 Disconnect the cables on the HV Board from the thyristors and fans Mark the cables from the thyristors with L1 L2 and L3 7 Remove t...

Page 4: ...pass contactor after marking them 13 Mount the cables from the Display and the Keypad on the new LV Board On PSTB units reconnect the cables from the built in by pass contactor Be careful how you conn...

Page 5: ...e cables from the thyristors White side PST Black side 19 For upgrade to Torque Control it is important to check the connection on the current transformer see fig below 20 If the two cables on each cu...

Page 6: ...6 22 Mount the front cover four screws 23 Connect all cables to terminal 1 to 20 external keypad PTC sensor Fieldbusplug and the cables to 1L1 3L2 and 5L3...

Page 7: ...n Are you sure 4 Set the required display language Press Store to save the value and press Next to continue If wrong language was selected press Back for previous level These commands are valid for th...

Page 8: ...4 720 PSTB840 1000 Yes 750 0 86 0 17 0 024 4 840 PSTB1050 1200 Yes 750 0 88 0 12 0 017 4 1050 Table 2 valid for softstarter order code 1SFA895xxxR7000 690V version Softstarter size CT Ratio Ir Int ByP...

Page 9: ...9...

Page 10: ...10 ABB Automation Technologies AB CEWE Control S 721 61 V ster s SWEDEN Telephone 46 21 32 07 00 TELEFAX 46 21 12 60 01...

Reviews: