USER M A N UA L
How to install a new parallel UPS system:
1. Before installing a new parallel UPS system,
prepare the input/output wires, breakers and
a main maintenance mechanical switch or
static switch.
2. Independent battery packs for each UPS.
3. Remove the cover plate from the parallel
connection port on the UPS, connect each UPS
one by one with a parallel connection cable
and make sure the cable is screwed in tightly.
—
17
Parallel cable connection
—
17
Parallel system wiring diagram