![ABB Power2 850-M46 Operation Manual Download Page 152](http://html.mh-extra.com/html/abb/power2-850-m46/power2-850-m46_operation-manual_2838038152.webp)
Operation Manual / Power2 850-M / 4.2 High-pressure stage
4 Disassembly and assembly / 4.10 Installing the cartridge group
© Copyright 2018 ABB. All rights reserved.
HZTL4063_EN
Revision B
October 2018
Fig. 18: Installing the cartridge group 2
Part number
Thread and tightening torque
42099
M12x80
80 Nm
Table 8: Tightening torque (42099)
5. Fit a screw (42099) as a safeguard.
6. Remove screw (90656), nut (90415) and plates (90031).
7. Remove screws (90900) and bracket (90030).
8. Fit screws (42099). Observe the tightening torque.
9. Fit a new O-ring (42010).
Page
22
/
37